MIS19-00345
| BLD-Conference | 12/4/2019 | 12/11/2019 | 12/11/2019 4:07:03 PM | P | DONE |
|
|
check on 5 day notice from 12/4//application made on 12/09/2019//will check in two weeks//
|
BLD19-03693
| BLD-Wall Bracing | 12/10/2019 | 12/11/2019 | 12/11/2019 4:05:51 PM | P | PASS |
|
|
shear // Christina Phone #: ###-####//exterior walls only//hold downs need to be installed correctly in wall//
|
BLD19-03701
| BLD-Conference | 12/10/2019 | 12/11/2019 | 12/11/2019 3:52:31 PM | P | DONE |
|
|
call Mark ###-####//discrepancies in engineering and architectural plans for shear and hold down locations//plan mod required for changes to correct//1 ft encroachment on side setback will need to be approved by zoning//
|
BLD19-01801
| BLD-Blower Door Test Results | 12/11/2019 | 12/11/2019 | 12/11/2019 2:45:41 PM | P | DONE |
|
|
4.43 ACH 50
|
BLD19-01801
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 2:44:32 PM | P | PASS |
|
|
Vinny Phone #: ###-####//platform step added for egress window in 2nd story//final complete//
|
BLD19-01801
| DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 2:43:55 PM | P | PASS |
|
|
|
BLD19-00527
| BLD-Wall Bracing | 12/10/2019 | 12/11/2019 | 12/11/2019 2:31:40 PM | P | PART |
|
|
This is for the hardware portion of shear. All wall panels were previously inspected. Phone #: ###-#### Inspection requested via web by Travis Blackburn//exterior nailing and straping ok per plans//still need to check interior hold downs//
|
BLD19-03505
| BLD-Footing | 12/11/2019 | 12/11/2019 | 12/11/2019 1:52:42 PM | P | PART |
|
|
mud at 2pm - Brandon Phone #: ###-####//setbacks ok--verify rear setback prior to wall inspection//
|
BLD19-02967
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 1:31:26 PM | P | PASS |
|
|
Call prior to going Phone #: 2086296694 >> Inspection requested via mobile web by David Sherman
|
BLD19-02967
| DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 1:31:12 PM | P | PASS |
|
|
|
BLD19-03555
| BLD-Wall Bracing | 12/11/2019 | 12/11/2019 | 12/11/2019 12:55:49 PM | P | PASS |
|
|
|
BLD19-03555
| BLD-Wall Bracing | 12/11/2019 | 12/11/2019 | 12/11/2019 12:54:13 PM | P | CANC |
|
|
Not sure if this is ''Shear Inspection'' Phone #: ###-#### Inspection requested via web by Christian Mikesell//needs shear//
|
BLD19-03555
| BLD-Framing/Rough-in | 12/11/2019 | 12/11/2019 | 12/11/2019 12:53:46 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Christian Mikesell//not ready for framing//
|
BLD19-00362
| BLD-Other | 12/10/2019 | 12/11/2019 | 12/11/2019 12:21:33 PM | A | PASS |
|
|
TROY- inspection for hardlid Phone #: ###-####//area c hardlids--ok add fire caulk to small conduit//area d wall cover ok in back of gym area--still need to see cafeteria//1 hour wall in electrical room was looked at and discussed for penetrations///
|
BLD19-03252
| BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 11:40:27 AM | A | CANC |
|
|
GILBERT Phone #: ###-####
|
BLD19-03180
| BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 11:40:04 AM | A | PASS |
|
|
GILBERT Phone #: ###-####//ok per details, site plan and survey pins//
|
BLD19-03181
| BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 11:39:15 AM | A | PASS |
|
|
GILBERT Phone #: ###-####//ok per details, site plan and survey pins//
|
BLD19-03187
| BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 11:38:34 AM | A | PASS |
|
|
GILBERT Phone #: ###-####//ok per details and survey, site plan//
|
BLD19-03188
| BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 11:37:32 AM | A | PASS |
|
|
GILBERT Phone #: ###-####//ok per details and survey pins//
|
BLD19-02700
| BLD-Framing/Rough-in | 12/9/2019 | 12/11/2019 | 12/11/2019 11:15:32 AM | A | PART |
|
|
Matt Phone #: ###-####//correction notice posted//ok to insulate//
|
BLD19-00553
| BLD-Conference | 12/11/2019 | 12/11/2019 | 12/11/2019 10:39:06 AM | A | DONE |
|
|
Gary--###-####//gary has engineered fix for beams in garage//need to have engineer verify and ok footings used for the pole barn// setbacks appear to be ok per plan//
|
BLD19-04008
| BLD-Footing | 12/10/2019 | 12/11/2019 | 12/11/2019 10:17:41 AM | A | PASS |
|
|
10am pouring - Dane Phone #: ###-####//temps ok//bar installed per plans//setbacks set by surveyor//
|
BLD19-02377
| BLD-Blower Door Test Results | 12/11/2019 | 12/11/2019 | 12/11/2019 9:10:52 AM | A | DONE |
|
|
4.4 ACH 50
|
BLD19-02377
| BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 9:08:22 AM | A | PASS |
|
|
Garage code 3162 Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD19-02377
| DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 9:08:12 AM | P | PASS |
|
|
|
BLD19-02600
| BLD-Blower Door Test Results | 12/11/2019 | 12/11/2019 | 12/11/2019 8:58:18 AM | A | DONE |
|
|
4.22 ACH 50
|
BLD19-02600
| BLD-Final | 12/11/2019 | 12/11/2019 | 12/11/2019 8:57:42 AM | A | PASS |
|
|
|
BLD19-02600
| DOC - Permit Finaled | 12/11/2019 | 12/11/2019 | 12/11/2019 8:57:32 AM | P | PASS |
|
|
|
BLD19-02600
| BLD-Final | 12/10/2019 | 12/11/2019 | 12/11/2019 8:56:20 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD18-03190
| BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 8:43:51 AM | | DONE |
|
|
Expires: 01/25/20
|
BLD18-02167
| BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 8:43:07 AM | | DONE |
|
|
Expires: 01/26/20
|
BLD18-02985
| BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 8:42:00 AM | | DONE |
|
|
Expires: 01/25/20
|
BLD18-03146
| BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 8:41:16 AM | | DONE |
|
|
Expires: 01/25/20 no inspections have been completed
|
BLD18-03145
| BLD-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 8:39:58 AM | | DONE |
|
|
Expires: 01/26/20 no inspections have been completed
|