MEC97-02549
| INSP - Partial final | 12/12/1997 | 12/12/1997 | 12/12/1997 12:00:00 AM | | PART |
|
|
/ / 337 - for break room area 2nd floor
|
MEC97-03017
| INSP - Framing/ Rough-in | 12/12/1997 | 12/12/1997 | 12/12/1997 12:00:00 AM | | |
|
|
/ / 337 -
|
MEC97-03769
| INSP - Conference | 12/12/1997 | 12/12/1997 | 12/12/1997 12:00:00 AM | | PASS |
|
|
/ / 337 - conference ok
|
MEC97-03692
| INSP - Rough-in & Gas Pressure | 12/11/1997 | 12/12/1997 | 12/12/1997 12:00:00 AM | A | PASS |
|
|
12/12/97 337 - Scheduled by Hello! on 12/11/97 at 13:17:32. FNL -OK FINAL
|
MEC97-01606
| INSP - Final | 12/11/1997 | 12/12/1997 | 12/12/1997 12:00:00 AM | A | NH |
|
|
12/12/97 337 - unit 702 UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
MEC97-01606
| INSP - Final | 12/11/1997 | 12/12/1997 | 12/12/1997 12:00:00 AM | A | NH |
|
|
12/12/97 337 - unit 702 UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
MEC97-03552
| INSP - Conference | 12/12/1997 | 12/12/1997 | 12/12/1997 12:00:00 AM | P | CANC |
|
|
12/12/97 337 - reinspection owner will be there 4 and 5 this is alan area he said he will do this
|
MEC97-03764
| INSP - Gas pressure test | 12/12/1997 | 12/12/1997 | 12/12/1997 12:00:00 AM | P | PASS |
|
|
12/12/97 337 - HYDRONIC TEST/ IDAHO POWER 6TH FLOOR hydronic piping ok
|