Inspections for the day of: Tuesday, December 12, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03048 BLD-Framing/Rough-in12/11/200012/12/200012/12/2000 12:00:00 AMAFAIL
bob-- ###-#### ceiling grid, c/n wire wraps 12/12/2000 10:29:36 AM
BLD00-01765 BLD-Final12/11/200012/12/200012/12/2000 12:00:00 AMAPASS
rob ###-#### l/c issued 12/12/2000 10:00:36 AM
BLD00-02511 BLD-Final12/11/200012/12/200012/12/2000 12:00:00 AMANR
all of the others should of been Monday - Don ###-####
BLD00-03075 BLD-Framing/Rough-in12/11/200012/12/200012/12/2000 12:00:00 AMANR
Troy ###-####; not a frame insp...need details for stairs; conf only 12/12/2000 1:50:34 PM
BLD98-01409 BLD-Framing/Rough-in12/11/200012/12/200012/12/2000 12:00:00 AMAPART
ext canopy ateast side, ok pending spec insp reports for spray on fp 12/12/2000 11:28:40 AM
BLD00-03565 BLD-Foundation12/11/200012/12/200012/12/2000 12:00:00 AMAPART
FOUND WALL- CHRIS -###-####
BLD00-02659 BLD-Framing/Rough-in12/12/200012/12/200012/12/2000 12:00:00 AMPPART
fire corridor-- frank ###-####; need to submit re hvac at corridor 12/12/2000 5:24:30 PM
BLD00-02645 BLD-Energy code compliance12/12/200012/12/200012/12/2000 12:00:00 AMPFAIL
Rory, ###-####, verify beam substitution, shim beam, strap hips at lower connection, etc 12/12/2000 3:51:08 PM
MEC00-03661 Final12/12/200012/12/200012/12/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/12/2000 at 09:58:34. Contact: ###-####.
BLD99-03148 BLD-Framing/Rough-in12/12/200012/12/200012/12/2000 12:00:00 AMPFAIL
###-####lobby lid, seal 1hr const. 12/12/2000 5:25:45 PM
BLD00-02586 BLD-Final12/12/200012/12/200012/12/2000 12:00:00 AMPFAIL
FN OCC FRANK ###-#### , c/n, posts at porch, air seal 12/12/2000 3:42:18 PM