ELE01-03137
| ELE-Aging Inspection | 12/12/2001 | 12/12/2001 | 12/12/2001 12:00:00 AM | | PART |
|
|
suc 12/12/2001 9:33:04 AM
|
ELE01-03189
| ELE-Aging Inspection | 12/12/2001 | 12/12/2001 | 12/12/2001 12:00:00 AM | | PASS |
|
|
|
ELE01-03928
| Permanent Service | 12/11/2001 | 12/12/2001 | 12/12/2001 12:00:00 AM | A | FAIL |
|
|
###-#### grounding all messed up needs to attach to both electrodes, remove grd electrode conductor from sub panels called 12/12/2001 10:32:00 AM
|
ELE01-01354
| Final | 12/11/2001 | 12/12/2001 | 12/12/2001 12:00:00 AM | A | PASS |
|
|
###-#### DENNIS no card at job site to sign 12/12/2001 11:09:35 AM
|
ELE01-04151
| Final | 12/11/2001 | 12/12/2001 | 12/12/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 17:32:18. Contact: ###-####. not ready contractor will call for pm inspection called 12/12/2001 10:05:00 AM
|
ELE01-03334
| Electrical Rough-In | 12/11/2001 | 12/12/2001 | 12/12/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 11:34:50. Contact: ###-####. basement hard ceiling 12/12/2001 4:10:43 PM
|
ELE01-02331
| Final | 12/12/2001 | 12/12/2001 | 12/12/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 07:57:40. Contact: ###-####. cor. posted called left message see JF for details 12/12/2001 3:19:28 PM
|
ELE01-04019
| Permanent Service | 12/12/2001 | 12/12/2001 | 12/12/2001 12:00:00 AM | P | FAIL |
|
|
MIKE ###-#### bond hot and cold ar both
W H guy kit for mast terminate GEC to neutral bus not enclosure, note needs 4 wire to range from sub panel see JF for details 12/12/2001 2:15:41 PM
|
ELE01-03579
| Final | 12/12/2001 | 12/12/2001 | 12/12/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 10:14:31. Contact: ###-####. called contractor needs to check his work no power gfci etc. 12/12/2001 4:11:41 PM \ 12/12/2001 4:11:45 PM
|