BLD02-01466
| BLD-Grading Inspection | 12/12/2002 | 12/12/2002 | 12/12/2002 12:00:00 AM | | PASS |
|
|
Final grading and drainage is approved.
|
BLD02-02878
| BLD-Grading Inspection | 12/12/2002 | 12/12/2002 | 12/12/2002 12:00:00 AM | | PASS |
|
|
Geotechnical engineer has approved the footing subgrade.
|
BLD02-02735
| BLD-Grading Inspection | 12/12/2002 | 12/12/2002 | 12/12/2002 12:00:00 AM | | PASS |
|
|
Footing subgrade has been approved by the geotechnical engineer
|
BLD02-02123
| BLD-Grading Inspection | 12/12/2002 | 12/12/2002 | 12/12/2002 12:00:00 AM | | PASS |
|
|
Footing subgrade has been approved by the geotechnical engineer.
|