Inspections for the day of: Monday, December 12, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03109 BLD-Footing12/12/200512/12/200512/12/2005 5:10:21 PMPPART
Scheduled by a contractor via Hello! on 12/12/2005 at 9:44:48 AM. Contact: ###-####.
Appears OK forms covered with blankets
BLD05-01878 BLD-Framing/Rough-in12/9/200512/12/200512/12/2005 4:59:16 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Weston Kons
C/N Too many to list
BLD05-01957 BLD-Framing/Rough-in12/9/200512/12/200512/12/2005 3:47:57 PMPPASS
ted ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD05-02867 BLD-Final12/9/200512/12/200512/12/2005 3:47:37 PMPPASS
leon ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
C/C issued
BLD05-02707 BLD-Framing/Rough-in12/9/200512/12/200512/12/2005 1:36:54 PMAPASS
Scheduled by a contractor via Hello! on 12/9/2005 at 11:22:12 AM. Contact: ###-####.
BLD04-03000 BLD-Foundation12/9/200512/12/200512/12/2005 1:36:31 PMAPART
Scheduled by a contractor via Hello! on 12/9/2005 at 11:52:17 AM. Contact: ###-####.
MIS05-00226 BLD-Conference12/6/200512/12/200512/12/2005 1:36:10 PMADONE
I scheduled this insp.........to check up on owner Robert Gustafson ###-#### to see if he obtained Bldg, Electr, and Plumb permits. This was a complaint C/N issued.
Perry called and said that owner was in the office and is obtaining req. permits.
BLD01-02249 BLD-Conference12/9/200512/12/200512/12/2005 1:34:11 PMAPASS
Scheduled by a contractor via Hello! on 12/9/2005 at 10:26:55 AM. Contact: ###-####.
Finally have the approved plan. C/N....Appr plan shows full Concrete floor......Opening in floor connects to surge tank....which connects directly to pool. CMU wall (4hr) not fully grouted and is compromised by flush mount fire ext box, and several electr box penitr. Firestop all penitrations and wall/ceiling intersection 2hr walls. Horiz ceiling assembly not per plan. Need 3 layers 5/8 in leiu of 2. Verify duct opening into rm has proper damper. Verify 2 access hatches in ceiling are self closing and self latching and rated 2hr.
BLD05-02867 DOC - Permit Finaled12/12/200512/12/200512/12/2005 12:00:00 AMPPASS