Inspections for the day of: Monday, December 12, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00746 INSP-Sprinkler Rough-in/Hydro12/12/200512/12/200512/12/2005 4:09:17 PMPPART
Overhead rough-in at the hard lid area first floor lobby is approved for cover.
FIR05-00398 INSP-Final Inspection12/12/200512/12/200512/12/2005 3:36:42 PMPNR
Project is not complete, next phase which includes work under this permit has not started.
FIR05-00398 INSP-Sprinkler Rough-in/Hydro12/12/200512/12/200512/12/2005 3:29:12 PMPPART
Overhead rough-in is satisfactory for work installed, area as circled on approved plans is not complete or inspected at this time.
BLD05-01789 FIRE-Final Inspection12/9/200512/12/200512/12/2005 2:35:27 PMPPASS
Fire life safety issues are acceptable, corrections have been completed, inspection passed.
FIR05-00507 INSP-Final Inspection12/12/200512/12/200512/12/2005 2:33:57 PMPPASS
Fire sprinkler passed final inspection.
FIR05-00385 INSP-Sprinkler Rough-in12/12/200512/12/200512/12/2005 11:20:15 AMPPART
First floor overhead rough-in is okay for cover at the grid ceiling areas only, began 24 hour air test at 9:30 am at 42psi.
FIR04-00812 INSP-Sprinkler Rough-in/Hydro12/9/200512/12/200512/12/2005 11:15:18 AMADEFR
mike Note: 24 hr air test; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles NOTE: Wrong permit number called in, this was meant for FIR05-00385 for the overhead, not under FIR04-00812 for the associated UG supply.
BLD05-02799 FIRE-Final Inspection12/9/200512/12/200512/12/2005 9:47:21 AMAPASS
Life safety passed inspection.
BLD05-02867 FIRE-Final Inspection12/9/200512/12/200512/12/2005 9:31:38 AMAPASS
The existing hood suppression system has been inspected and verified compliant, life safety passed inspection.