ELE06-04155
| Final | 12/12/2006 | 12/12/2006 | 12/12/2006 4:28:10 PM | P | FAIL |
|
|
WE HAVE MADE OUR COORRECTIONS AND ARE READY FOR THE COMPLETION OF THE FINAL INSPECTION. ; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called, added to exst corr notice, breaker blanks shall be put in panel spaces, mc and emt shall be strapped, Johnson controller is to be abandoned, still has duct over panels, so left corr notice on door to mech room.
|
ELE06-03550
| Final | 12/12/2006 | 12/12/2006 | 12/12/2006 4:25:07 PM | P | FAIL |
|
|
Jason; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt called, left corr notice, BCC address shall agree with BLD- supposed to be suite 260, ID mains to agree with panels, NEC 408.4 every circuit shall be clear, concise, evident, and identified for its specific purpose. Detail shall allow each circuit to be distinguished from others., 110.12(C) there shall be no damaged parts, panel doors shall operate correctly.
|
ELE06-03185
| Final | 12/12/2006 | 12/12/2006 | 12/12/2006 3:34:07 PM | P | PASS |
|
|
JOB COMPLETE FINAL INSPECTION KEY IS ABOVE METER. ; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called contr to add conduit straps, ok to final
|
ELE06-02364
| Conference | 12/12/2006 | 12/12/2006 | 12/12/2006 1:56:26 PM | P | DONE |
|
|
Scheduled by a contractor via Hello! on 12/12/2006 at 7:21:44 AM. Contact: ###-####. talked about buck-boost xfmrs, application ok, physical install up to contractor
|
ELE06-04490
| Permanent Service | 12/12/2006 | 12/12/2006 | 12/12/2006 12:09:02 PM | P | PASS |
|
|
Service change.; Phone #: ###-#### Internet Inspection Request from: Kathy Briggs p/s u/g rec ok, owner needs to provide clear space about panel before final
|
ELE06-03939
| Final | 12/11/2006 | 12/12/2006 | 12/12/2006 11:46:56 AM | A | PASS |
|
|
Glenn; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett ok to final
|
ELE06-03938
| Final | 12/11/2006 | 12/12/2006 | 12/12/2006 10:16:29 AM | A | PASS |
|
|
Glenn; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett ok to final
|
ELE05-02003
| Final | 12/11/2006 | 12/12/2006 | 12/12/2006 9:56:59 AM | A | PART |
|
|
jarod - half the 1st floor guest rooms ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith 1st fl clgs ok to cover anop, 1st floor rooms anop ok to final
|
ELE06-03829
| Electrical Rough-In | 12/11/2006 | 12/12/2006 | 12/12/2006 9:31:53 AM | A | FAIL |
|
|
Requesting inspection to cover ceiling for area North of main corridor.; Phone #: ###-#### Internet Inspection Request from: Dan Hardisty called, left corr notice, BCC no violations shall be retained, NEC 725.3 abandoned Cl 2,3 PLTC cables shall be removed, 300.4(C) cables or raceway type wiring methods shall be supported according to their applicable articles
|
ELE06-04510
| Electrical Rough-In | 12/11/2006 | 12/12/2006 | 12/12/2006 8:56:28 AM | A | CANC |
|
|
zane ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wrong type request, see rip
|
ELE06-04510
| Rough-In Permanent Service | 12/12/2006 | 12/12/2006 | 12/12/2006 8:53:23 AM | A | PASS |
|
|
zane ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith corr made, ric ok, p/s u/g n ok
|
ELE06-04477
| Temporary Service | 12/11/2006 | 12/12/2006 | 12/12/2006 8:30:06 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Lynn Solmon t/s u/g n ok
|