BLD06-00749
| FIRE-Final Inspection | 12/10/2007 | 12/12/2007 | 12/13/2007 8:45:59 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 12/10/2007 at 9:56:35 AM.
|
FIR06-00091
| INSP-Alarm Testing | 12/11/2007 | 12/12/2007 | 12/12/2007 4:11:58 PM | P | DONE |
|
|
Inspected the kitchen area. See the approved plans for deficiencies.
|
FIR07-00991
| INSP-Final Inspection | 12/11/2007 | 12/12/2007 | 12/12/2007 4:10:37 PM | P | PASS |
|
|
Permit finaled
|
BLD07-02770
| FIRE-Final Inspection | 12/12/2007 | 12/12/2007 | 12/12/2007 4:09:19 PM | P | PASS |
|
|
life safety passed.
|
FIR07-00836
| INSP-Final Inspection | 12/11/2007 | 12/12/2007 | 12/12/2007 11:14:26 AM | A | PASS |
|
|
Permit finaled
|
FIR07-00578
| INSP-Sprinkler Rough-in | 12/11/2007 | 12/12/2007 | 12/12/2007 10:47:22 AM | A | PASS |
|
|
See the city approved plans for the two additional rooms where the sprinkler piping is ok to cover.
|
BLD07-02420
| FIRE-Final Inspection | 12/11/2007 | 12/12/2007 | 12/12/2007 10:46:41 AM | A | FAIL |
|
|
Provide exit sign/emergency light as shown on the plans. Install ceiling tile. Provide interlocks as discussed and shown in Chapter 15 of the IFC for the paint booth.
|
FIR07-00914
| INSP-Final Inspection | 12/11/2007 | 12/12/2007 | 12/12/2007 9:51:18 AM | A | PASS |
|
|
permit finaled
|
FIR07-00931
| INSP-Final Inspection | 12/11/2007 | 12/12/2007 | 12/12/2007 9:50:26 AM | A | PASS |
|
|
Permit finaled
|
FIR07-00875
| INSP-Final Inspection | 12/11/2007 | 12/12/2007 | 12/12/2007 9:27:59 AM | A | PASS |
|
|
permit finaled
|