FIR07-00932
| INSP-Sprinkler Rough-in/Hydro | 12/12/2008 | 12/12/2008 | 12/12/2008 6:11:22 PM | P | PART |
|
|
24 hr. air testing for the two dry systems passed.
|
BLD08-02493
| FIRE-Final Inspection | 12/11/2008 | 12/12/2008 | 12/12/2008 6:10:35 PM | P | PASS |
|
|
C/N items completed with the exception of posting the new max. occupant load number-to be done prior to structural final. Life safety passed.
|
BLD07-02933
| FIRE-Final Inspection | 12/12/2008 | 12/12/2008 | 12/12/2008 6:07:55 PM | P | PASS |
|
|
Fire life safety finaled.
|
BLD08-02064
| FIRE-Final Inspection | 12/11/2008 | 12/12/2008 | 12/12/2008 1:38:21 PM | P | PASS |
|
|
Life safety finaled, one extinguisher to be installed at the 1st floor level as discussed.
|
BLD08-01864
| FIRE-Final Inspection | 12/12/2008 | 12/12/2008 | 12/12/2008 1:36:13 PM | P | PASS |
|
|
Fire life safety passed.
|
BLD08-02071
| FIRE-Final Inspection | 12/11/2008 | 12/12/2008 | 12/12/2008 11:44:35 AM | A | PASS |
|
|
Correction notice items verified for compliance, fire life safety completed acceptable.
|
FIR08-00714
| INSP-Final Inspection | 12/12/2008 | 12/12/2008 | 12/12/2008 11:43:36 AM | A | PASS |
|
|
Fire sprinkler permit passed final inspection.
|
BLD08-01034
| FIRE-Final Inspection | 12/12/2008 | 12/12/2008 | 12/12/2008 10:47:35 AM | A | NR |
|
|
Pending project related fire alarm permits inspections and final approvals.
|
FIR07-01042
| INSP-Sprinkler Rough-in/Hydro | 12/12/2008 | 12/12/2008 | 12/12/2008 10:45:10 AM | A | PART |
|
|
Pneumatic dry systems test complete.
|
FIR08-00605
| INSP-Sprinkler Rough-in/Hydro | 12/11/2008 | 12/12/2008 | 12/12/2008 10:35:29 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 12/11/2008 at 12:58:51 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Dec 12 2008 10:35AM.
|