ESC07-01363
| General Inspection | 12/9/2008 | 12/12/2008 | 12/12/2008 11:12:00 AM | P | PASS |
|
|
Bank is backfilles, live planting have been inserted and ESC blanket installed. Photo's taken.
|
ESC08-00924
| General Inspection | 12/11/2008 | 12/12/2008 | 12/12/2008 10:21:38 AM | A | PASS |
|
|
Inspected site: Looks in good condition. Dewatering is continuing. Comment to RP-When backfilling activities occur they will need to divert water into basin currently direct discharge into vegetation which is running into drainage which is ok as long as the water is clear.
|