Inspections for the day of: Friday, December 12, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00832 Aging Inspection12/12/200812/12/200812/16/2008 3:26:09 PM DONE
ESC06-00834 Aging Inspection12/12/200812/12/200812/12/2008 4:15:36 PM DONE
ESC06-00834 Site Final12/12/200812/12/200812/12/2008 4:15:28 PMPPASS
ESC06-00830 Aging Inspection12/12/200812/12/200812/12/2008 4:14:29 PM DONE
ESC06-00830 Site Final12/12/200812/12/200812/12/2008 4:14:19 PMPPASS
ESC06-00833 Aging Inspection12/12/200812/12/200812/12/2008 4:12:14 PM DONE
ESC06-00833 Site Final12/12/200812/12/200812/12/2008 4:12:08 PMPPASS
ESC08-00706 General Inspection12/10/200812/12/200812/12/2008 3:59:40 PMPFAIL
Tracking has occured on the west of project out into the subdivision. Also heavy sediment and debris out in the gutterpan of main drag through project. Told the RP to have cleaned up by the end of the day.
ESC08-00700 BMP Violation12/10/200812/12/200812/12/2008 3:22:25 PMAPART
Sweeping up access as inspection is occuring. Will be completed by the end of the day. Stock pile still present but no threat is seen.
ESC08-00779 Site Preparation12/12/200812/12/200812/12/2008 3:20:57 PM FAIL
Vebal Correction to RP.
Clean all hard surfaces of all sediment and debris.
Install a sediment barrier along drainage swale where the disturbed soil in either under 3ft away or right to it.
Sweep up all sediment and debris from the drainage swale throughout the school to the storm drain inlet. Will re-inspect on 12/15/08.
ESC08-00734 BMP Violation12/10/200812/12/200812/12/2008 1:32:15 PMAPASS
ESC08-00954 General Inspection12/12/200812/12/200812/12/2008 9:18:09 AMAFAIL
Verbal Notice: Left a message for the RP.
1.Need to clean up all sediment and debris off of all hard surfaces.
2. Make sur that all solid waste (except wood piles) is placed into the trash container that is provided.
Will re-inspect on 12/16/08 PM
ESC08-00999 Site Preparation12/12/200812/12/200812/12/2008 8:59:12 AM FAIL
Verbal Notice:
1. Post the ESC sign.
2. Protect storm drain inlet at the end of alley way going out to Barber Station Rd.
3. Make sure that all sediment from project area is cleaned up by the end of each day and/or prior to any storm events. Will re-inspect 12/16/08