Inspections for the day of: Wednesday, December 12, 2012.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-03197 BLD-Final12/11/201212/12/201212/12/2012 4:13:43 PMPPART
Cal Phone #: ###-#### c/n by fire pending correction/ will resch. upon fire sign off.
ESC12-01034 Random Inspection12/12/201212/12/201212/12/2012 2:21:22 PMPPART
contractor is in route to post sign.
BLD12-02806 BLD-Foundation12/12/201212/12/201212/12/2012 2:20:27 PMPPART
Dane Phone #: ###-#### front and back peir pads not placed for ft/ call for insp. if to be placed w/flat work.
ESC11-00904 Random Inspection12/12/201212/12/201212/12/2012 2:13:38 PMPPASS
BLD11-03019 BLD-Conference12/12/201212/12/201212/12/2012 2:13:20 PMPPASS
Tom, I have got a couple of things I want you to take a look at. This should not take up much of your time. Thanks Phone #: ###-#### >> Inspection requested via web by Gary Simon stair head height ok at guard station access.
BLD12-02498 BLD-Final12/11/201212/12/201212/12/2012 1:27:56 PMPNR
Please call Wayne at ###-#### 20 minutes before arrival Phone #: ###-#### >> Inspection requested via web by kevin debelloy failed by fire
ESC12-01004 Random Inspection12/11/201212/12/201212/12/2012 10:33:14 AMAPASS
BLD12-02668 BLD-Framing/Rough-in12/11/201212/12/201212/12/2012 10:32:47 AMAPASS
Bobby Phone #: ###-####
ESC12-01005 Random Inspection12/11/201212/12/201212/12/2012 10:25:37 AMAPASS
BLD12-02669 BLD-Framing/Rough-in12/11/201212/12/201212/12/2012 10:25:13 AMAFAIL
Bobby Phone #: ###-#### bearing blks to1// two top chords cut by plm provide mfg. fix.
ESC12-01071 Site Preparation12/11/201212/12/201212/12/2012 9:47:09 AMAPASS
BLD12-02887 BLD-Footing12/11/201212/12/201212/12/2012 9:46:50 AMAPASS
Dave Phone #: ###-####