Inspections for the day of: Wednesday, December 12, 2012.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS11-00297 BLD-Conference12/11/201212/12/201212/12/2012 5:03:21 PMACANC
Cecelia phone
ESC12-01089 Site Preparation12/12/201212/12/201212/12/2012 4:58:44 PMPPASS
Ron phone
BLD12-02918 BLD-Footing12/12/201212/12/201212/12/2012 4:58:11 PMPPASS
Ken Patton-Late afternoon please Phone #: ###-####
BLD12-01732 BLD-Final12/12/201212/12/201212/12/2012 4:57:33 PMPNR
Justin Phone #: ###-####
BLD12-03009 BLD-Footing12/12/201212/12/201212/12/2012 3:50:13 PMPPASS
Dane Phone #: ###-####
ESC12-01115 Site Preparation12/12/201212/12/201212/12/2012 3:49:43 PMPFAIL
Michah (RP)....Corrections.....Do not pour any concrete prior to cleaning up hard surfaces, installing sign. installing straw waddle at sidewalk and providing conc. washout.
BLD12-02639 BLD-Final12/12/201212/12/201212/12/2012 3:33:35 PMPPASS
jerry Phone #: ###-####
BLD12-02639 DOC - Permit Finaled12/12/201212/12/201212/12/2012 3:33:20 PMPPASS
ESC12-00995 Site Final12/12/201212/12/201212/12/2012 3:32:38 PMPFAIL
Gerald phone Need to complete landscaping.
ESC11-00796 Site Final12/12/201212/12/201212/12/2012 3:31:29 PMPPASS
Alan phone
ESC11-00796 DOC - Permit Finaled12/12/201212/12/201212/12/2012 3:31:17 PMPPASS
BLD11-02659 BLD-Final12/12/201212/12/201212/12/2012 3:30:54 PMPPASS
Josh phone ###-####
BLD11-02659 DOC - Permit Finaled12/12/201212/12/201212/12/2012 3:30:34 PMPPASS
ESC12-00846 Site Preparation12/12/201212/12/201212/12/2012 3:30:05 PMPPART
Called Rob (RP) left mssg with his secretary. Ventana street needs attention.
GCB12-00140 GCB-Framing12/11/201212/12/201212/12/2012 3:25:47 PMAPASS
Ben @ ###-####
Frame and Energy code OK.
BLD12-02229 BLD-Footing12/11/201212/12/201212/12/2012 3:24:29 PMPPART
bill - around 3 please Phone #: ###-####
Footing at front patio was formed 20" wide. This area was overdug and packed with hoe. Drain rock was installed last 12". I asked for compaction tests. No compaction tests where done at Contractors request. Proceeding at own risk.
BLD11-02659 BLD-Final12/11/201212/12/201212/12/2012 10:47:57 AMAPASS
josh - call for access Phone #: ###-####
BLD11-02659 DOC - Permit Finaled12/12/201212/12/201212/12/2012 10:47:41 AMPPASS