Inspections for the day of: Wednesday, December 12, 2012.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00637 INSP-Sprinkler Rough-in/Hydro12/12/201212/12/201212/12/2012 3:51:00 PMPPASS
See the city approved plans for location of partial underground inspection where the piping is ok to cover.
FIR12-00712 INSP-Final Inspection12/12/201212/12/201212/12/2012 2:52:45 PMPFAIL
No testing was performed due to the audio/visual not having the required weatherproof backbox. Spacing was verified ok.
FIR12-00365 INSP-Sprinkler Rough-in12/12/201212/12/201212/12/2012 2:47:01 PMPPASS
See the city approved plans for locations where piping can be covered. I posted a stop work order on the front of the building due to hardlids continuing to be installed prior to a sprinkler rough-in inspection. I had a previous conversation with contractor about this. Stop work order states "Stop all sheet rock that is covering sprinkler piping. Cover inspection is required".
BLD12-00551 FIRE-Conference12/12/201212/12/201212/12/2012 2:45:43 PMPDONE
I posted a stop work order on the front of the building due to hardlids continuing to be installed prior to a sprinkler rough-in inspection. I had a previous conversation with contractor about this. Stop work order states "Stop all sheet rock that is covering sprinkler piping. Cover inspection is required".
FIR12-00420 INSP-Sprinkler Rough-in12/11/201212/12/201212/12/2012 1:01:05 PMAPASS
The tenting has been repaired on the third floor. Piping can be covered.
BLD12-02257 FIRE-Final Inspection12/11/201212/12/201212/12/2012 10:14:19 AMAPASS
Life safety passed
FIR06-00015 FIR-Aging Inspection12/12/201212/12/201212/12/2012 9:03:39 AM NR
Waiting for Taylor Brothers to call for final inspection.