Inspections for the day of: Friday, December 12, 2014.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00845 INSP-Final Inspection12/12/201412/12/201412/12/2014 5:44:04 PMAPASS
Fire alarm work passed functional testing. Permit finaled.
FIR14-00859 INSP-Final Inspection12/12/201412/12/201412/12/2014 5:43:16 PMPFAIL
Scope of work not completed per the permit documents. Contractor to finish work as indicated or if no modifications are deemed necessary, void permit.
FIR14-00860 INSP-Final Inspection12/12/201412/12/201412/12/2014 5:39:44 PMPPASS
Fire alarm testing completed satisfactory, permit finaled.
BLD14-02773 FIRE-Conference12/11/201412/12/201412/12/2014 5:39:07 PMPDONE
On site conference regarding project related fire alarm work, completion schedule, etc.
FIR14-00840 INSP-Final Inspection12/11/201412/12/201412/12/2014 5:36:48 PMAPART
Final pending removal of temporary wall partitions. (This activity was added in error so we have changed the case status back to Issued.)
FIR14-00835 INSP-Final Inspection12/11/201412/12/201412/12/2014 5:33:03 PMAPASS
Fire sprinkler permit finaled.
FIR14-00834 INSP-Final Inspection12/11/201412/12/201412/12/2014 5:32:07 PMAPASS
Final walkthrough passed. Fire sprinkler permit finaled.
FIR14-00833 INSP-Final Inspection12/11/201412/12/201412/12/2014 5:31:24 PMAPASS
Fire sprinkler permit work approved for final.
FIR14-00430 INSP-Sprinkler Rough-in12/10/201412/12/201412/12/2014 1:02:43 PMAPART
Rough-in inspection completed for tower one 4th floor, 3rd floor and podium levels room units 430 - 437, 330 - 337, 230 - 237. Discussed obstructions that may occur due to soffits not yet built, temps at heads in HVAC closets and in proximity to diffusers, fire stop material compatibility with CPVC. Coverage at stairways not yet installed.
BLD14-02919 FIRE-Final Inspection12/11/201412/12/201412/12/2014 10:45:08 AMANR
Conditions per IFC for delayed egress locks are not satisfied. Plans do not reflect delayed egress hardware installed.
BLD14-03096 FIRE-Final Inspection12/11/201412/12/201412/12/2014 10:44:46 AMANR
Conditions per IFC for delayed egress locks are not satisfied. Plans do not reflect delayed egress hardware installed.