ELE15-01348
| Electrical Rough-In | 12/12/2016 | 12/12/2016 | 12/12/2016 3:07:59 PM | P | PASS |
|
|
Call Brandon Robinson for ceiling and wall reconstruction rough in on level 2 and 3 stack 2. Phone #: ###-#### Inspection requested via web by Tom Betty Bathrooms and elevator lobbies for areas noted rough in ok cover
|
ELE16-03999
| Electrical Rough-In | 12/12/2016 | 12/12/2016 | 12/12/2016 2:57:38 PM | P | PASS |
|
|
BLD permit under plan mod for stair relocation. Basement to remain unfinished. All romex and knob and tube wiring has been replaced with MC cable. Rough in ok cover
|
ELE16-02922
| Final | 12/12/2016 | 12/12/2016 | 12/12/2016 2:05:31 PM | P | PASS |
|
|
We are requesting a final inspection for this afternoon for this project. Our onsite contact is Luke @ ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Clint Tate No card posted. Final ok
|
ELE16-03999
| Electrical Rough-In | 12/12/2016 | 12/12/2016 | 12/12/2016 1:40:59 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Chris Berthelot BLD permit still under review. BLD permit address says 17 N. Orchard with 21 salon remodel. Called Carlos to attach ELE to BLD16-03691. Posted correction notice to recall when BLD issued.
|
ELE16-03322
| Final | 12/12/2016 | 12/12/2016 | 12/12/2016 12:31:04 PM | P | PASS |
|
|
code 4224 Phone #: ###-#### Inspection requested via web by Bob Glenn Final ok
|
ELE16-03794
| Electrical Rough-In | 12/9/2016 | 12/12/2016 | 12/12/2016 10:08:06 AM | A | PASS |
|
|
Can light frames rough-in in bathroom vestibules on 9th floor. Phone #: ###-#### Inspection requested via web by steve ragan Bathroom entrance ceilings rough in ok cover
|
ELE16-03909
| Rough-In Permanent Service | 12/10/2016 | 12/12/2016 | 12/12/2016 9:03:43 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn Rough in ok cover p/s u/g n ok
|