ELE13-01961
| ELE-Aging Inspection | 12/12/2018 | 12/12/2018 | 12/20/2018 5:55:01 AM | | DONE |
|
|
Talked to contractor on phone. He is going to try to contact and call in a few inspections
|
ELE18-04324
| Rough-In Permanent Service | 12/12/2018 | 12/12/2018 | 12/12/2018 2:32:28 PM | P | PASS |
|
|
Inspect panel so ID power can reconnect service Phone #: ###-#### Inspection requested via web by Brian Gifford Service already energized. This is for the re-feed to a new exterior house panel. Grds neut seperated. Equipt grd run with conductors. Existing grd rod in place.
|
ELE18-03308
| Final | 12/12/2018 | 12/12/2018 | 12/12/2018 2:14:39 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey Ok final. Expansion coupling corrected.
|
ELE18-03159
| Conference | 12/12/2018 | 12/12/2018 | 12/12/2018 2:01:49 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Eric Brown Discussed downstairs switch location.
|
ELE18-03588
| Final | 12/12/2018 | 12/12/2018 | 12/12/2018 2:01:11 PM | P | PASS |
|
|
Code 2805 or call me Phone #: ###-#### Inspection requested via web by Neal Rumsey Ok final. Correction made.
|
ELE18-04519
| Rough-In Permanent Service | 12/11/2018 | 12/12/2018 | 12/12/2018 12:30:50 PM | P | CANC |
|
|
Addition will be ready for rough in inspection. Idaho Power will be shutting power off, dropping overhead service line, we will change out existing service to new 200 amp service, we will need inspection around 1:30 ish. Phone #: ###-#### Inspection requested via web by Kurt Carlson Talked to Kurt. Job not supposed to be inspected until Fri the 12/14
|
ELE17-03951
| Electrical Rough-In | 12/11/2018 | 12/12/2018 | 12/12/2018 12:05:35 PM | A | PASS |
|
|
Contact: Clayton Pennington.... ceiling inspection area C 2nd floor please Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover 1st-2nd flr main halls, and remainder of 2nd flr classrooms.
|
ELE18-04680
| Conference | 12/11/2018 | 12/12/2018 | 12/12/2018 12:04:51 PM | A | CANC |
|
|
Troy. ###-#### Will meet IDP tomorrow on-site. IDP cannot meet until 1pm 12/13. Re-scheduled for that time.
|
ELE18-03938
| Final | 12/11/2018 | 12/12/2018 | 12/12/2018 11:07:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Ok final. Garage walls not be covered. Boards have been placed on all areas where romex is under 8' horiz for protection.
|
ELE18-04711
| Electrical Rough-In | 12/12/2018 | 12/12/2018 | 12/12/2018 10:21:59 AM | A | PASS |
|
|
Less than 10'' trench in North East front end of store for underground power to new Lash bar. Phone #: ###-#### Inspection requested via web by Steve Blackmer Ok cover conduit for display case.
|
ELE18-04705
| Electrical Rough-In | 12/11/2018 | 12/12/2018 | 12/12/2018 9:50:16 AM | A | PASS |
|
|
Aaron Phone #: ###-#### Ok cover lower room to W of kitchen and garage only
|