ELE00-01560
| Electrical Rough-In | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PART |
|
|
on the second floor DAve ###-####. 2nd floor, areas 1and2; walls ele r/i. 12/13/2000 11:12:47 AM
|
ELE00-04751
| Final | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/12/2000 at 13:09:38. Contact: ###-####.. h.v.a.c. unit; compressor. 12/13/2000 9:48:51 AM
|
ELE00-04020
| Electrical Rough-In | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/12/2000 at 13:15:42. Contact: ###-####.. ufer ok for concrete pour. 12/13/2000 8:57:50 AM
|
ELE00-04037
| Electrical Rough-In | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
ceiling for cover Lyle ###-####. third floor; northend, ceiling and offices. 12/13/2000 3:37:28 PM
|
ELE00-04565
| Electrical Rough-In | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
underground conduit for slab floor Steve ###-#### last thing please. pvc conduit underground/slab. 12/13/2000 3:40:09 PM
|
ELE00-02603
| Electrical Rough-In | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 10:23:18. Contact: ###-####. contractor called in wrong permit number by mistake. 12/13/2000 2:09:36 PM
|
ELE00-04373
| Electrical Rough-In | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 10:35:48. Contact: ###-####.
|
ELE00-04762
| Electrical Rough-In | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PASS |
|
|
###-####. conference; discussed radiant heater installation. 12/13/2000 1:48:19 PM
|