BLD00-02588
| BLD-Concrete | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PART |
|
|
rebar and tilt up panels Jean ###-#### pouring at 9:00 wip 12/13/2000 10:30:40 AM
|
MEC00-04164
| Pressure Test | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PASS |
|
|
Sean ###-####
|
BLD00-02434
| BLD-Conference | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
CONF-- BILL-- ###-#### 12/13/2000 2:33:48 PM may have eng design cut for trusss at one hour wall 12/13/2000 5:16:15 PM
|
MIS00-00300
| BLD-Final | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
###-#### or ###-#### Elaine ok for temp aok for final after fier ext is re certed 12/13/2000 10:50:41 AM
|
BLD99-00773
| BLD-Framing/Rough-in | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | NH |
|
|
Scott ###-####
|
BLD00-03415
| BLD-Footing | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 08:17:32. Contact: ###-####.
|
BLD00-02801
| BLD-Framing/Rough-in | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 09:04:01. Contact: ###-####. cn posted 12/13/2000 4:07:47 PM
|
BLD00-02931
| BLD-Framing/Rough-in | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/13/2000 at 09:31:23. Contact: ###-####. stairs incomplete headroom does not comply 12/13/2000 3:42:15 PM
|
BLD00-03152
| BLD-Framing/Rough-in | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
FR INSP RANDY-- ###-####--CALL 1ST BEFORE INSP wip ok to cover half of int walls and part of occ wall 12/13/2000 4:48:13 PM
|