BLD00-02795
| BLD-Framing/Rough-in | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PASS |
|
|
David ###-####
ok to insulate, c/n done ok 12/13/2000 3:50:19 PM
|
MEC00-04273
| Rough-in | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PASS |
|
|
David ###-####
|
MEC00-04347
| Rough-in | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PASS |
|
|
JAN ###-#### R/I
|
MEC00-04230
| Rough-in | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/12/2000 at 15:53:36. Contact: ###-####.
verify pressure test on low side, need to hook up all house fan 12/13/2000 9:43:40 AM
|
MEC00-04230
| Pressure Test | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/12/2000 at 15:53:58. Contact: ###-####.
high side ok ,, low side fail 12/13/2000 9:42:29 AM
|
BLD00-02947
| BLD-Other | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/12/2000 at 13:07:37. Contact: ###-####.
attic interior firewall nailing ok 12/13/2000 9:55:42 AM
|
MEC00-03740
| Final | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PART |
|
|
FOR 1109 SIDE-- ###-#### FN-ON GAR DOOR CODE 7550
verify f. p. 12/13/2000 11:28:14 AM
|
MEC00-04342
| Final | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PART |
|
|
FOR BOTH 1107 & 1109 --FN ###-#### FN
verify light gets put in 12/13/2000 11:29:21 AM
|
BLD00-03342
| BLD-Footing | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 415 On 12/13/2000 11:48:12 AM set backs ok per scott in p/z, wip
|
BLD00-02795
| BLD-Energy code compliance | 12/11/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
DAVE ###-#### ENER CODE
seal ok,, need to insulate now 12/13/2000 3:47:41 PM
|
BLD99-02372
| BLD-Final | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PASS |
|
|
Annie ###-#### she'll be out in the garage earlier the better
interior not sheetrocked 12/13/2000 1:04:00 PM
|
BLD00-02063
| BLD-Final | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PASS |
|
|
FN -- BRETT-- ###-####
c of c # 18923 issued ,,, still need to finish rock work on outside 12/13/2000 1:51:27 PM
|
BLD00-03238
| BLD-Footing | 12/12/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
Bill ###-####
|
BLD00-02867
| BLD-Foundation | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
Robert ###-#### foundation wall
|
BLD99-02771
| BLD-Final | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PASS |
|
|
FN --RE-INSP JILL ###-####
c of c #19908 issued 12/13/2000 3:27:45 PM
|
BLD00-03347
| BLD-Framing/Rough-in | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | NR |
|
|
Dale ###-####
conference only on job 12/13/2000 4:19:57 PM
|
BLD00-03433
| BLD-Framing/Rough-in | 12/13/2000 | 12/13/2000 | 12/13/2000 12:00:00 AM | P | PART |
|
|
SHEAR JASON -###-####
exterior shear ok w/ verbal corrections 12/13/2000 1:16:50 PM
|