BLD01-02451
| BLD-Framing/Rough-in | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | FAIL |
|
|
SHEER WALL TROY ###-#### no plans on site no work done. 12/13/2001 10:32:57 AM
|
MEC01-03740
| Rough-in | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | FAIL |
|
|
JERRY ###-#### b vent interior crushed/ wiring in contact with vent/ compustables to clse. 12/13/2001 11:00:30 AM
|
MEC01-03740
| Pressure Test | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | FAIL |
|
|
JERRY ###-#### test ok high psi to furn manafold. 12/13/2001 10:33:34 AM must be reworked to meet duplex. 12/13/2001 3:20:34 PM
|
BLD01-02222
| BLD-Concrete | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | PART |
|
|
###-#### pending special insp. report. 12/13/2001 3:19:59 PM
|
BLD01-02401
| BLD-Footing | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | FAIL |
|
|
###-#### ground not protected 2 inches snow and ground frozen . 12/13/2001 9:48:33 AM
|
BLD01-01775
| BLD-Final | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 301 On 12/13/2001 9:24:43 AM final ok upon sign off from p/z. and plm for perrm occ.
|
BLD01-02678
| BLD-Framing/Rough-in | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | FAIL |
|
|
###-#### king stud at north garage door pannel not nailled. 12/13/2001 3:49:32 PM
|
BLD01-00650
| BLD-Framing/Rough-in | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/12/2001 at 16:03:30. Contact: ###-####.
|