BLD01-02521
| BLD-Aging Inspection | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | | NR |
|
|
roof 12/14/2001 6:45:01 PM
|
BLD01-02531
| BLD-Framing/Rough-in | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | NR |
|
|
doc ###-#### partial r/i bath compliance
|
BLD00-01925
| BLD-Final | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | FAIL |
|
|
alan ###-####, c/n no plans, air seal, occ sep, etc. 12/13/2001 12:10:20 PM
|
MEC00-02873
| Final | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | PASS |
|
|
doug ###-####
|
MEC00-03411
| Final | 12/12/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | A | PASS |
|
|
Rhonda ###-####
|
BLD01-01634
| BLD-Final | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | NR |
|
|
fn occ bill ###-#### ...rec'd letter from arch re deletion of one stairway from bsmt; ok as two exits remain. Need spec insp's report re seismic upgrade. keep c/n 12/13/2001 3:09:11 PM
|
BLD01-00596
| BLD-Wall cover | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 08:22:30. Contact: ###-####....ok to cover , complete shear nailing at 1st fl. 12/13/2001 4:25:13 PM
|
BLD00-01643
| BLD-Framing/Rough-in | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by Inspector: 340 On 12/13/2001 9:37:49 AM walk thru, ###-#### mel...in error 12/13/2001 12:17:04 PM
|
BLD98-03705
| BLD-Conference | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 12/13/2001 9:38:28 AM meet new supt. Alan Gammel ...jobsite safety, etc 12/14/2001 8:54:20 AM 12/14/2001 8:55:12 AM
|
BLD01-02531
| BLD-Framing/Rough-in | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 340 On 12/13/2001 12:11:21 PM ###-####...sidelites, restrooms ok at fl's 2&3. 12/13/2001 5:26:33 PM
|
BLD01-00186
| BLD-Framing/Rough-in | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 340 On 12/13/2001 12:16:15 PM grid clg ok exc. add spreaders at loose ends...obtain hvac & elec oks, seal penetrations at rated smoke barriers
12/13/2001 3:12:46 PM
|
BLD01-00596
| BLD-Framing/Rough-in | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/13/2001 4:26:19 PM c/n ok,except need 1st fl. shear at int.
|
BLD01-00596
| BLD-Energy code compliance | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/13/2001 4:26:51 PM insul ok
|
BLD98-03705
| BLD-Foundation | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/13/2001 5:28:47 PM caisson grid line 4...pend mti reports
|
BLD00-01649
| BLD-Conference | 12/13/2001 | 12/13/2001 | 12/13/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 12/13/2001 5:35:03 PM w/ Mel re elev mach. rms. & penthouses; NC/NR ok beyond 20' to p.l...hoist ways to be vented.
|