Inspections for the day of: Friday, December 13, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02925 BLD-Foundation12/12/200212/13/200212/13/2002 12:00:00 AMAPASS
###-####
BLD02-01929 BLD-Framing/Rough-in12/12/200212/13/200212/13/2002 12:00:00 AMAFAIL
TIM ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N posted. 12/13/2002 11:40:42 AM
BLD02-02699 BLD-Framing/Rough-in12/12/200212/13/200212/13/2002 12:00:00 AMAPASS
###-#### CARL
BLD02-02699 BLD-Energy code compliance12/12/200212/13/200212/13/2002 12:00:00 AMAPASS
###-#### CARL
BLD02-02588 BLD-Footing12/13/200212/13/200212/13/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/13/2002 at 06:32:55. Contact: ###-####. wip--house ok--garage ready at time of inspection. 12/13/2002 11:40:24 AM
BLD02-02518 BLD-Framing/Rough-in12/13/200212/13/200212/13/2002 12:00:00 AMPPART
SHEAR--BRIAN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Shear ok 12/13/2002 3:30:36 PM
BLD02-02522 BLD-Framing/Rough-in12/13/200212/13/200212/13/2002 12:00:00 AMPPART
SHEAR--BRIAN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Shear ok 12/13/2002 3:30:47 PM
BLD02-02520 BLD-Framing/Rough-in12/13/200212/13/200212/13/2002 12:00:00 AMPNR
SHEAR--BRIAN--AIR INFULTRATION; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Prior shear ok--not ready for frame. 12/13/2002 2:51:20 PM
BLD02-02512 BLD-Framing/Rough-in12/13/200212/13/200212/13/2002 12:00:00 AMPNR
SHEAR--BRIAN--AIR INFULTRATION; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Prior shear ok--not ready for frame. 12/13/2002 2:50:15 PM
BLD02-02527 BLD-Framing/Rough-in12/13/200212/13/200212/13/2002 12:00:00 AMPNR
SHEAR--BRIAN--AIR INFULTRATION; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Prior shear ok--not ready for frame. 12/13/2002 2:50:54 PM
BLD02-01920 BLD-Framing/Rough-in12/12/200212/13/200212/13/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 12/12/2002 at 21:35:26. Contact: ###-####. C/N posted--Need all trade sign offs plus for shear need all holdowns nailed with 16d nails, all shear panels blocked and nailed. 12/13/2002 2:20:55 PM
BLD02-02831 BLD-Framing/Rough-in12/12/200212/13/200212/13/2002 12:00:00 AMPPART
###-#### floyd Ok to insulate--Needs to secure a mech. permit and inspection on the exhaust fan in bedroom. Need to verify stairs, bearing points in crawl, above kit. header on main foor and egress window in bedroom--at later date. 12/13/2002 1:59:04 PM