FIR04-00390
| INSP-Sprinkler Rough-in/Hydro | 12/10/2004 | 12/13/2004 | 12/13/2004 12:00:00 AM | A | PASS |
|
|
Overhead hydro test passed 12/13/2004 12:36:18 PM
|
FIR04-00368
| INSP-Conference | 12/10/2004 | 12/13/2004 | 12/13/2004 12:00:00 AM | A | PASS |
|
|
Tenting for the sprinkler piping in the clubhouse/pool area is ok to cover. Still need cover inspection for the combustible concealed spaces that will be filled with insulation. 12/13/2004 11:47:23 AM
|
FIR04-00722
| INSP-Sprinkler Rough-in/Hydro | 12/13/2004 | 12/13/2004 | 12/13/2004 12:00:00 AM | A | FAIL |
|
|
Tenant space locked. Sprinkler contractor did not have access. To be rescheduled. 12/13/2004 9:24:06 AM
|
FIR04-00728
| INSP-Final Inspection | 12/13/2004 | 12/13/2004 | 12/13/2004 12:00:00 AM | P | FAIL |
|
|
There are two pendants off of a single 1" outlet in the storage room and the riser needs its annual inspection 12/13/2004 2:03:41 PM
|
BLD04-01963
| FIRE-Final Inspection | 12/10/2004 | 12/13/2004 | 12/13/2004 12:00:00 AM | P | FAIL |
|
|
New overhead door in existing storage room obstructs upright sprinkler heads, provide one more fire extinguisher near the storage room entrance, provide approved door hardware on the restrooms and remove thumbturns at the main exits 12/13/2004 4:21:47 PM
|