Inspections for the day of: Tuesday, December 13, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-01391 FIRE-Final Inspection12/12/200512/13/200512/13/2005 3:30:16 PMPPASS
Life safety finaled
BLD05-02940 FIRE-Final Inspection12/13/200512/13/200512/13/2005 3:30:04 PMPPART
Life safety finaled
FIR05-00385 INSP-Sprinkler Rough-in/Hydro12/13/200512/13/200512/13/2005 3:20:30 PMPFAIL
Pre-action hydro test failed.
BLD05-02149 FIRE-Final Inspection12/12/200512/13/200512/13/2005 3:19:52 PMAFAIL
Need a fire sprinkler permit for the 1" sprinkler drop to this new restroom. The sprinkler drop is already installed. When this is done life safety can be finaled.
FIR05-00797 INSP-Final Inspection12/12/200512/13/200512/13/2005 12:04:21 PMAPASS
Fire sprinkler finaled
FIR05-00773 INSP-Sprinkler Rough-in/Hydro12/12/200512/13/200512/13/2005 12:03:35 PMAPASS
Sprinkler piping is ok to cover
FIR05-00198 INSP-Final Inspection12/12/200512/13/200512/13/2005 11:10:49 AMAFAIL
See city approved plans for items from the past inspection that weren't corrected yet. Strobes aren't sync'd. A reinspection fees is being applied.
FIR05-00489 INSP-Final Inspection12/6/200512/13/200512/13/2005 9:17:44 AMAPASS
Permit finaled
FIR05-00732 INSP-Final Inspection12/6/200512/13/200512/13/2005 9:13:53 AMAPASS
Permit finaled