Inspections for the day of: Wednesday, December 13, 2006.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAimee Hughes
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00628 Complaint Inspection12/13/200612/13/200612/14/2006 12:10:35 PMPPART
Contacted RP about concern regarding potential trackout from site onto Silver Crest. Reminded RP that all wattles need to be maintained or repaired if necessary. Will follow up with site inspection on 12-15-06.
ESC06-01200 Tracking Control11/27/200612/13/200612/14/2006 12:08:19 PMAPASS
Site looks okay. Left vm for RP to be sure to watch mud and dirt trackout during the wet weather.
ESC06-01652 Tracking Control11/27/200612/13/200612/14/2006 12:08:07 PMAPASS
Site looks okay. Left vm for RP to be sure to watch mud and dirt trackout during the wet weather.
ESC06-01602 Complaint Inspection12/13/200612/13/200612/14/2006 12:00:34 PMPCANC
ESC06-01201 Tracking Control11/27/200612/13/200612/14/2006 11:41:19 AMAPASS
Site looks okay.
ESC06-00974 Tracking Control11/27/200612/13/200612/14/2006 11:23:39 AMAPASS
Site looks okay, reminded RP to maintain all bmp's especially sediment barriers.
ESC06-01148 Tracking Control11/27/200612/13/200612/14/2006 11:21:01 AMAPART
verbal c/n to RP to repost ESC sign and make sure that all other bmp's are being maintained.
ESC06-00881 Tracking Control11/27/200612/13/200612/14/2006 11:17:22 AMACANC
ESC06-00859 Site Final12/13/200612/13/200612/13/2006 3:46:59 PMPPASS
Final stabilization has been completed.
ESC05-01845 Site Final12/13/200612/13/200612/13/2006 3:46:15 PMPPASS
Final stabilization has been completed.
ESC05-01989 Site Final12/13/200612/13/200612/13/2006 3:45:56 PMPPASS
Final stabilization has been completed.
ESC05-01854 Site Final12/13/200612/13/200612/13/2006 3:45:40 PMPPASS
Final stabilization has been completed.
ESC05-01668 Site Final12/13/200612/13/200612/13/2006 3:45:15 PMPPASS
Final stabilization has been completed.
ESC06-01509 Site Final12/13/200612/13/200612/13/2006 3:14:48 PMPPASS
ESC06-01677 Site Final12/13/200612/13/200612/13/2006 3:14:34 PMPPASS
ESC06-01075 Tracking Control11/20/200612/13/200612/13/2006 3:11:00 PMAPART
Contacted RP about maintaining all bmp's, especially on slopes and sensitive areas.
ESC05-01156 Site Final12/13/200612/13/200612/13/2006 2:02:30 PMPPASS
Final stabilization has been completed.
ESC05-01156 Tracking Control11/20/200612/13/200612/13/2006 2:01:56 PMACANC
ESC05-01589 Tracking Control11/20/200612/13/200612/13/2006 1:59:38 PMAPART
Contacted RP about maintaining all bmp's, especially on slopes and sensitive areas and inspecting d/i protection.
ESC05-01591 Tracking Control11/20/200612/13/200612/13/2006 1:58:21 PMAPART
Contacted RP about maintaining all bmp's, especially on slopes and sensitive areas and reposting ESC sign.
ESC06-00087 Tracking Control11/20/200612/13/200612/13/2006 1:56:37 PMAPART
Contacted RP about maintaining all bmp's, especially on slopes and sensitive areas.