ESC12-01044
| Site Preparation | 12/13/2012 | 12/13/2012 | 12/13/2012 12:00:00 AM | | PASS |
|
|
Berm adjacent to canal is protected and serves as perimeter control. Tracking control in place.
|
ESC12-00126
| General Inspection | 12/13/2012 | 12/13/2012 | 12/13/2012 12:00:00 AM | | PASS |
|
|
|
ESC12-01068
| Site Preparation | 12/13/2012 | 12/13/2012 | 12/13/2012 12:00:00 AM | P | PASS |
|
|
perimeter controls in place a top of slope/edge of disturbance. Construction entrance going in at time of inspection.
|
ESC12-01015
| Random Inspection | 12/13/2012 | 12/13/2012 | 12/13/2012 12:00:00 AM | P | PART |
|
|
Stabilized construction needs installed. Spoke with owner of general contractor and will coordinate with RP and install entrance while backfilling.
|