FIR13-00233
| INSP-Final Inspection | 12/12/2013 | 12/13/2013 | 12/18/2013 5:09:20 PM | A | PART |
|
|
Jonothan Phone #: ###-####
|
FIR12-00681
| INSP-Final Inspection | 12/12/2013 | 12/13/2013 | 12/13/2013 3:38:09 PM | A | PART |
|
|
C/N items include matched temp heads at an electrical room, replace hanger on added coverage, access to NW elevator machine room, floor drain function at the fire pump room.
|
FIR13-00133
| INSP-Final Inspection | 12/12/2013 | 12/13/2013 | 12/13/2013 3:34:32 PM | A | PART |
|
|
C/N items on 16th floor and the penthouse level.
|
FIR13-00011
| INSP-Final Inspection | 12/12/2013 | 12/13/2013 | 12/13/2013 3:33:21 PM | A | PART |
|
|
Refer to fire plan review note # 2 regarding alternate agreement for trip times at the dry systems. C/N items noted at floors 7,8,9, and 12..
|
FIR12-00723
| INSP-Final Inspection | 12/12/2013 | 12/13/2013 | 12/13/2013 3:30:39 PM | A | PART |
|
|
Noted unfinished circulation, lobby and corridor areas.
|
FIR12-00721
| INSP-Final Inspection | 12/12/2013 | 12/13/2013 | 12/13/2013 3:29:21 PM | A | PART |
|
|
Incomplete ceilings, finishes and construction for shell work at the lobby and entry areas.
|
FIR12-00634
| INSP-Final Inspection | 12/12/2013 | 12/13/2013 | 12/13/2013 3:27:14 PM | A | PART |
|
|
Refer to fire plan review notes item # 7 regarding isolation valves. Also noted missing caps at several locations.
|
FIR13-00601
| INSP-Final Inspection | 12/13/2013 | 12/13/2013 | 12/13/2013 9:11:31 AM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR13-00601
| INSP-Conference | 12/12/2013 | 12/13/2013 | 12/13/2013 9:10:54 AM | A | DONE |
|
|
Site inspection and functional testing completed.
|
FIR13-00661
| INSP-Sprinkler Rough-in | 12/12/2013 | 12/13/2013 | 12/13/2013 9:08:42 AM | A | PART |
|
|
Okay to cover overhead fire sprinkler work at the second floor grid ceiling areas per the project scope.
|