NAF16-00012
| INSP-Sprinkler Rough-in/Hydro | 12/12/2016 | 12/13/2016 | 12/13/2016 12:19:02 PM | A | PASS |
|
|
All three system satisfactorily hydro tested. Roughin third floor completed. Heat tape has been installed.
-Tenting was not complete and will need to be reinspected. No dry sidewalls installed yet
|
BLD16-02720
| FIRE-Conference | 12/13/2016 | 12/13/2016 | 12/13/2016 12:00:00 AM | P | DONE |
|
|
Phone discussion with contractor on sequence of inspections in regards to knox box/switches being installed on all electric gates. Discussed that he should coordinate with fire department for key hand over/ops check. Fire department is not required at final life safety inspection.
|