Inspections for the day of: Tuesday, December 13, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-01111 FIRE-Final Inspection12/13/201612/13/201612/13/2016 4:25:37 PMPPART
Partial life fire safety inspection complete, final fire sprinkler inspection complete, final fire alarm inspection partially complete (refer to activities under FIR16-00749 for alarm notes), knox box is in place, FDC knox caps are in place, fire extinguishers are in place with current inspection tags. Life fire safety can be signed of as finaled when the elevator recall function and elevator smoke detectors are tested and complete.
FIR16-00749 INSP-Final Inspection12/13/201612/13/201612/13/2016 4:21:21 PMPPART
Partial final for fire alarm inspection complete, audio visual device inspection complete, fire sprinkler component inspection complete, when elevator is complete recall function will need to be tested.
FIR16-00266 INSP-Final Inspection12/13/201612/13/201612/13/2016 4:19:31 PMPPASS
Final fire sprinkler inspection passed/complete
FIR16-00266 INSP-Alarm Testing12/13/201612/13/201612/13/2016 4:18:05 PMPCANC
Inspection request is for a final inspection on fire sprinklers, this inspection request cancelled and a new one will be generated.
FIR16-00686 INSP-Final Inspection12/13/201612/13/201612/13/2016 2:20:29 PMPCANC
This inspection request will not be completed until the fire alarm issues with FIR16-00086 are resolved, this inspection request is cancelled.
BLD16-02995 FIRE-Final Inspection12/13/201612/13/201612/13/2016 2:19:57 PMPCANC
This inspection request will not be completed until the fire alarm issues with FIR16-00086 are resolved, this inspection request is cancelled.
BLD15-01502 FIRE-Final Inspection12/13/201612/13/201612/13/2016 2:15:49 PMPPASS
Final fire sprinkler inspection complete, final fire alarm inspection complete, knox box is in place on east main entry, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD15-01500 FIRE-Final Inspection12/12/201612/13/201612/13/2016 2:12:24 PMPCANC
Inspection request is for BLD15-01502, this request is cancelled and a new inspection request generated.
FIR15-00896 INSP-Final Inspection12/12/201612/13/201612/13/2016 2:11:37 PMPPASS
Final fire alarm inspection passed/complete
FIR16-00162 INSP-Final Inspection12/12/201612/13/201612/13/2016 2:11:12 PMPPASS
Final fire sprinkler inspection passed/complete
FIR15-00789 INSP-Final Inspection12/12/201612/13/201612/13/2016 12:16:07 PMAPASS
Final fire alarm inspection passed/complete
FIR16-00305 INSP-Sprinkler Rough-in/Hydro12/12/201612/13/201612/13/2016 12:15:39 PMADONE
Fire pump commissioning complete.
BLD14-01827 FIRE-Final Inspection12/9/201612/13/201612/13/2016 10:56:16 AMPCANC
Area of building being requested for occupancy is not ready for occupancy, inspection request will need to be rescheduled when work is complete.
FIR15-00458 INSP-Final Inspection12/12/201612/13/201612/13/2016 10:54:50 AMPPASS
Final fire sprinkler inspection passed/complete
FIR15-00784 INSP-Final Inspection12/12/201612/13/201612/13/2016 10:45:04 AMAPART
Partial final complete for fire alarms northside of the fire doors, remainder of the building will be inspected at a later date.