ELE17-03473
| Electrical Rough-In | 12/13/2017 | 12/13/2017 | 12/13/2017 2:32:34 PM | P | PASS |
|
|
Underground Inspection for service Phone #: ###-#### Inspection requested via web by Kevin Perez 110.3- Expansion joints shall be installed as per manufacturers instructions. Installed upside down. Bell end shall be positioned as to not collect moisture or dirt. 225.32- A disconnecting means shall be provided on house at a readily accessible location either outside on inside at nearest point of entrance of conductors. expansion joists located above grade. Verbal with Tom on corrections for final. Underground rough in ok cover
|
ELE17-04187
| Final | 12/13/2017 | 12/13/2017 | 12/13/2017 1:27:52 PM | P | NR |
|
|
George Morris is contact on site, ###-#### Phone #: ###-#### Inspection requested via web by Debby Pierce Branch circuit terminations not complete. Will call when complete.
|
ELE17-04186
| Final | 12/13/2017 | 12/13/2017 | 12/13/2017 1:27:10 PM | P | NR |
|
|
George Morris is contact on site, ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Branch circuit terminations not complete. Will call when ready.
|
ELE17-04187
| Permanent Service | 12/13/2017 | 12/13/2017 | 12/13/2017 12:28:22 PM | P | PASS |
|
|
George Morris is contact on site, ###-#### Phone #: ###-#### Inspection requested via web by Debby Pierce Available fault current for S-2 east side. 8650 p/s u/g n ok
|
ELE17-04186
| Permanent Service | 12/13/2017 | 12/13/2017 | 12/13/2017 12:27:02 PM | P | PASS |
|
|
George Morris is contact on site, ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Available fault current for S-1 west side. 3675 p/s u/g n ok
|
ELE17-03784
| Electrical Rough-In | 12/13/2017 | 12/13/2017 | 12/13/2017 12:24:31 PM | A | PASS |
|
|
Bathroom ceiling inspection Phone #: ###-#### Inspection requested via web by Debby Pierce Bathroom drop ceilings rough in ok cover
|
ELE17-04177
| Temporary Service | 12/12/2017 | 12/13/2017 | 12/13/2017 10:42:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE17-04155
| Rough-In Permanent Service | 12/12/2017 | 12/13/2017 | 12/13/2017 10:42:13 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Rough in ok cover p/s u/g n ok
|
ELE17-04027
| Conference | 12/12/2017 | 12/13/2017 | 12/13/2017 10:02:56 AM | A | DONE |
|
|
Consultation request Phone #: ###-#### Inspection requested via web by Steve Craig Discussed the required spacing for showroom window receptacles. Asked if maximum space for required receptacles could be increased to mount on columns. 210.62 states max spacing shall not exceed 12'. Shall not exceed 12' spacing between receptacles.
|
ELE17-03348
| Final | 12/12/2017 | 12/13/2017 | 12/13/2017 9:07:05 AM | A | PASS |
|
|
Cell Tower final inspection. Contact Matt Hannum. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
ELE17-03348
| Electrical Rough-In | 12/13/2017 | 12/13/2017 | 12/13/2017 9:06:46 AM | P | PASS |
|
|
Cell Tower final inspection. Contact Matt Hannum. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Surface roof conduit and circuit to attenna rough in ok
|