ELE18-04332
| Rough-In Permanent Service | 12/13/2018 | 12/13/2018 | 12/13/2018 3:07:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Rough-in ok to cover p/s u/g n ok
|
ELE17-02948
| Final | 12/12/2018 | 12/13/2018 | 12/13/2018 1:17:29 PM | P | PASS |
|
|
Please call ###-#### ###-#### Let them know you need inside. They will come let you in. Phone #: ###-#### Inspection requested via web by Kendra Lanham Back area not to used as automotov repair... Card signed Final ok
|
ELE18-04506
| Final | 12/12/2018 | 12/13/2018 | 12/13/2018 1:16:27 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Maes Solar Array final ok
|
ELE18-03572
| Final | 12/12/2018 | 12/13/2018 | 12/13/2018 10:22:14 AM | A | FAIL |
|
|
lock box on front porch code is 2010 Phone #: ###-#### Inspection requested via web by Nick Larson 210.8 GFCI protection required for all receptacles in bathtrooms(upstairs) Garage receptacles in-op
|
ELE18-04264
| Electrical Rough-In | 12/12/2018 | 12/13/2018 | 12/13/2018 10:01:30 AM | A | PASS |
|
|
homeowner Dale Phone #: ###-####-please call at least 20 minutes prior to meet for access ADU in detached building ok to cover
|
ELE18-04669
| Permanent Service | 12/12/2018 | 12/13/2018 | 12/13/2018 9:34:26 AM | A | PASS |
|
|
Upgraded exterior service and changed out interior panels. 2 separate circuits for new wall dividing building - NO other electrical was done by us. We need electrical turned on so we can trace out electrical for labeling. Phone #: ###-#### Inspection requested via web by Kendra Lanham AFC calc required for final(being a disc of power will not be required to change breakers if needed it is ok to energixe at this time)breakers installed are 10K rated.. p/s o/h rec ok
|