BLD99-02158
| FIRE-Sprinkler Rough-in | 12/13/1999 | 12/14/1999 | 12/14/1999 12:00:00 AM | A | PART |
|
|
ann ###-#### r/i fire spr Okay to cover new pharmacy only. Requested sprinkler and alarm plans.
|
BLD98-01168
| FIRE-Final Inspection | 12/13/1999 | 12/14/1999 | 12/14/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/13/1999 at 11:49:30. Contact: ###-####. Alarm test- need connection for reporting; test AHU shut-off.
|
BLD99-03392
| FIRE-Final Inspection | 12/14/1999 | 12/14/1999 | 12/14/1999 12:00:00 AM | P | CANC |
|
|
don --###-#### fire fn Reschedule.
|
BLD98-03661
| FIRE-Conference | 12/14/1999 | 12/14/1999 | 12/14/1999 12:00:00 AM | P | PART |
|
|
jim ###-#### conf To use new locker room- exiting requirements must be required before using.
|
BLD99-02580
| FIRE-Conference | 12/14/1999 | 12/14/1999 | 12/14/1999 12:00:00 AM | P | PART |
|
|
lafe ###-#### Duct detector required for 1 AHU; exit sign placement.
|
BLD99-03123
| FIRE-Final Inspection | 12/14/1999 | 12/14/1999 | 12/14/1999 12:00:00 AM | P | PASS |
|
|
this was signed by me for you on 12/3/99 per our conversation you change this entry for that date or today. any q's let me know 338
|
BLD99-01354
| FIRE-Final Inspection | 12/14/1999 | 12/14/1999 | 12/14/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 09:55:59. Contact: ###-####.
|