Inspections for the day of: Thursday, December 14, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01619 BLD-Final12/13/200012/14/200012/14/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/13/2000 at 09:21:30. Contact: 12/14/2000 4:06:24 PM k to sign at office, ok for c/o 12/14/2000 4:06:47 PM
BLD00-02375 BLD-Concrete12/13/200012/14/200012/14/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/13/2000 at 11:09:29. Contact: .pend report, 12/14/2000 9:14:22 AM
BLD00-02175 BLD-Conference12/13/200012/14/200012/14/2000 12:00:00 AMAFAIL
c/n issued for PROFIT meeting 12/14/2000 2:42:45 PM
BLD00-02586 BLD-Final12/13/200012/14/200012/14/2000 12:00:00 AMAPASS
###-####, c/n ok, l/c issued 12/14/2000 9:16:02 AM dwelling only! 12/14/2000 9:16:28 AM
BLD00-03288 BLD-Framing/Rough-in12/13/200012/14/200012/14/2000 12:00:00 AMAPART
please early ###-####
BLD00-03202 BLD-Framing/Rough-in12/14/200012/14/200012/14/2000 12:00:00 AMPPART
fr phil-- ###-####
MEC00-04369 Pressure Test12/14/200012/14/200012/14/2000 12:00:00 AMPFAIL
pres test lee ###-#### . go to 1016 22nd 12/14/2000 2:44:52 PM need 20 lbs, possible reconfiguation needed? 12/14/2000 5:14:28 PM
BLD00-02658 BLD-Conference12/14/200012/14/200012/14/2000 12:00:00 AMPPART
Added by Inspector: 340 On 12/14/2000 3:59:51 PM w/ YMC re hvac...need letter of clarification for corridor
BLD00-02659 BLD-Conference12/14/200012/14/200012/14/2000 12:00:00 AMPPART
Added by Inspector: 340 On 12/14/2000 5:22:58 PM w/ YMC, want to install 3000kw heater a exit corridor, need hvac eng's ok
BLD99-03148 BLD-Framing/Rough-in12/13/200012/14/200012/13/2000 12:00:00 AMANR
OK TO COVER BRETT- ###-#### keep c/n, 2nd, 3rd fl framing...seal/ patch 1hr const. 12/13/2000 4:37:28 PM