ELE01-03220
| ELE-Aging Inspection | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | | PASS |
|
|
still under construction 12/14/2001 7:50:06 AM
|
ELE01-02050
| Electrical Rough-In | 12/13/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | A | PASS |
|
|
FRANK ###-####. 2nd and 3rd floors; corrections completed. 12/14/2001 8:51:01 AM
|
ELE01-04179
| Rough-In Permanent Service | 12/13/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | A | PASS |
|
|
###-####. ele r/i; perm/svc. new service at garage in alley.
p/s oh n power plus #4179-ok 12/14/2001 9:28:55 AM
|
ELE01-04180
| Permanent Service | 12/13/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | A | PASS |
|
|
for a circuit insp --rob ###-#### . branch circuit disconnect. ok 12/14/2001 9:42:25 AM
|
ELE01-04146
| Rough-In Permanent Service | 12/11/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/11/2001 at 14:16:59. Contact: ###-####. r/i; perm/svc
p/s ug n boise basin ele #4146-ok 12/14/2001 10:19:49 AM
|
ELE01-04054
| Electrical Rough-In | 12/13/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PASS |
|
|
CEILING \\###-####. locker room and bathroom area ceiling r/i. 12/14/2001 11:07:43 AM
|
ELE00-01560
| Final | 12/13/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PART |
|
|
###-#### DAVE. 3rd floor; areas 3 and 4, temporary occupancy. 12/14/2001 3:07:39 PM
|
ELE01-03299
| Final | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PASS |
|
|
###-####. completed. 12/14/2001 10:50:51 AM
|
ELE01-04184
| Electrical Rough-In | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 09:58:37. Contact: ###-####. 6-walls r/i, ok. 12/14/2001 3:56:50 PM
|
ELE01-04206
| Rough-In Permanent Service | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PASS |
|
|
PATRICK ###-####. walls r/i. ok 12/14/2001 3:29:45 PM
|