BLD01-02254
| BLD-Framing/Rough-in | 12/13/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 12:36:03. Contact: ###-####.
|
MEC01-03292
| Final | 12/13/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 14:46:01. Contact: ###-####.. insulate exposed metal duct in crawl. 12/14/2001 10:24:24 AM
|
MEC01-03768
| Final | 12/13/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | A | NH |
|
|
###-####. no one home. 12/14/2001 10:06:34 AM
|
BLD01-03134
| BLD-Footing | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 07:50:13. Contact: ###-####.
|
BLD01-02268
| BLD-Footing | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 07:51:26. Contact: ###-####.
|
BLD01-02153
| BLD-Framing/Rough-in | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PART |
|
|
SHEER NAIL AND HOLD DOWN FRED ###-####. ok 2nd side of osb can be placed hold downs ok. 12/14/2001 3:20:37 PM
|
BLD01-03093
| BLD-Final | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | FAIL |
|
|
JACK ###-#### ###-#### FRAIMING AND FINAL. bracing not per plan,also hard surface driveway not in place as this has a roll down door, plot plan is not on site for review at this time. 12/14/2001 1:36:03 PM
|
BLD01-00737
| BLD-Framing/Rough-in | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PART |
|
|
RICH ###-####. lower floor top half of east corridor. 12/14/2001 3:47:30 PM
|
BLD01-02603
| BLD-Final | 12/14/2001 | 12/14/2001 | 12/14/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 407 On 12/14/2001 12:49:45 PM . ok perm occupancy. 12/14/2001 12:51:50 PM
|