BLD05-00635
| FIRE-Final Inspection | 12/14/2006 | 12/14/2006 | 12/15/2006 9:28:30 AM | P | PART |
|
|
A temporary occupancy was given until the fire alarm permit has been finaled, the grading permit is finaled and the temporary exit discharge light located at the east exit has been replaced with the permanent fixture.
|
FIR05-00836
| INSP-Final Inspection | 12/14/2006 | 12/14/2006 | 12/15/2006 9:25:31 AM | P | PART |
|
|
A temporary occupancy is being given on this fire alarm permit until the 2nd floor NAC panel has been tested and the as-built fire alarm plans have been resubmitted.
|
FIR06-00526
| INSP-Sprinkler Rough-in/Hydro | 12/14/2006 | 12/14/2006 | 12/14/2006 12:40:14 PM | P | FAIL |
|
|
Hydro test failed. Leaking at heads.
|
BLD06-02890
| FIRE-Final Inspection | 12/13/2006 | 12/14/2006 | 12/14/2006 12:39:31 PM | A | CANC |
|
|
Wrong inspection number called in.
|
BLD06-02317
| FIRE-Final Inspection | 12/13/2006 | 12/14/2006 | 12/14/2006 11:51:35 AM | A | PASS |
|
|
Fire life safety finaled
|
BLD06-02317
| FIRE-Alarm Testing | 12/13/2006 | 12/14/2006 | 12/14/2006 11:51:17 AM | A | PASS |
|
|
The access controled egress door functioned correctly
|
FIR06-00564
| INSP-Supply line flush | 12/14/2006 | 12/14/2006 | 12/14/2006 10:58:30 AM | A | PASS |
|
|
Underground supply piping is ok to cover. I notified the fire sprinkler contractor that the PIV will be required to be electronically supervised and that it would be a good idea to install the conduit in the open trench prior to bury.
|
FIR06-00843
| INSP-Sprinkler Rough-in/Hydro | 12/14/2006 | 12/14/2006 | 12/14/2006 10:40:29 AM | A | PASS |
|
|
Tenting inspection passed. Piping is ok to cover.
|
BLD06-01634
| FIRE-Final Inspection | 12/13/2006 | 12/14/2006 | 12/14/2006 10:16:34 AM | A | PASS |
|
|
Permit finaled
|
BLD06-03005
| FIRE-Final Inspection | 12/13/2006 | 12/14/2006 | 12/14/2006 9:44:07 AM | A | PASS |
|
|
Life safety finaled
|
FIR06-00623
| INSP-Sprinkler Rough-in | 12/13/2006 | 12/14/2006 | 12/14/2006 9:12:12 AM | A | PART |
|
|
Piping is ok to cover. One attic pendant head has not been installed and the attic pendant heads install on the 4" main at the riser are too far from the insulation. See city approved plans for locations. Contractor states access will be provided to verify these items later.
|
BLD06-01554
| FIRE-Final Inspection | 12/14/2006 | 12/14/2006 | 12/14/2006 9:09:39 AM | P | PASS |
|
|
Life safety finaled
|
FIR06-00750
| INSP-Final Inspection | 12/13/2006 | 12/14/2006 | 12/14/2006 9:09:24 AM | A | PASS |
|
|
Permit finaled
|
BLD06-02356
| FIRE-Final Inspection | 12/13/2006 | 12/14/2006 | 12/13/2006 1:26:57 PM | A | PASS |
|
|
Life safety finaled
|