Inspections for the day of: Friday, December 14, 2007.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00977 INSP-Sprinkler Rough-in12/14/200712/14/200712/17/2007 8:14:30 AMPPART
OH rough-in at the hard lid soffits and ceilings is approved for cover.
FIR07-00983 INSP-Final Inspection12/14/200712/14/200712/17/2007 8:13:15 AMPPASS
Fire sprinkler demo permit finaled.
FIR07-00937 INSP-Sprinkler Rough-in12/13/200712/14/200712/14/2007 3:15:09 PMAFAIL
Noted significant changes regarding the actual installation v. approved plans (main and branchline changes, supply riser changes, added heads, relocated sw heads, etc.), noted missing heads at closets on the 2nd floor, missing heads under the stairs 1st floor, added heads in mech, closets, branchline changes at the design area, noted the UG supply has been installed and covered without an inspection and will not be accepted until conditions of approval are met.
FIR07-00877 INSP-Final Inspection12/10/200712/14/200712/14/2007 2:39:24 PMAPART
Still missing required hanger support at one location, remaining work accepted.
BLD07-02303 FIRE-Final Inspection12/12/200712/14/200712/14/2007 1:34:05 PMPNR
Not ready...KR
BLD07-01562 FIRE-Final Inspection12/13/200712/14/200712/14/2007 1:32:20 PMAFAIL
Missing two fire extinguishers, one for the office area 1st floor and one for the warehouse, need to repair one EM light at the main entry/exit.
FIR07-00328 INSP-Final Inspection12/13/200712/14/200712/14/2007 1:29:59 PMAPASS
Fire alarm permit finaled.
FIR07-00895 INSP-Sprinkler Rough-in12/13/200712/14/200712/14/2007 10:56:50 AMAPART
OH sprinker system modifications are approved for cover at the drop ceilings, noted one change at supply piping to a head in the hallway is acceptable, final pending ceiling tile and escutcheons.
FIR07-00983 INSP-Sprinkler Rough-in12/13/200712/14/200712/14/2007 10:54:27 AMAPASS
Scope of work completed as indicated, inspection passed.
FIR07-00913 INSP-Sprinkler Rough-in/Hydro12/14/200712/14/200712/14/2007 10:22:40 AMAFAIL
Inspection for cover denied where the two 4" mains pass through the floor without provision for seismic clearance-need to install flex couplings or provide req. clearance per NFPA 13. The three heads at the storefront hard lid ceilings are okay to cover.
FIR07-00327 INSP-Final Inspection12/13/200712/14/200712/14/2007 10:19:18 AMAPASS
Correction completed, fire alarm permit finaled.
FIR07-00662 FIR-Aging Inspection12/14/200712/14/200712/14/2007 10:18:31 AM DEFR
Under construction, work in progress.