BLD11-01901
| FIRE-Conference | 12/14/2011 | 12/14/2011 | 12/14/2011 3:47:06 PM | P | DONE |
|
|
On site conference regarding fire code review notes, life safety items, fire alarm permit application for new tamper switch monitoring at the control vavles for the fire protection DCVA, etc.
|
FIR11-00571
| INSP-Final Inspection | 12/13/2011 | 12/14/2011 | 12/14/2011 3:24:34 PM | P | NR |
|
|
Charles is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR11-00571
| INSP-Sprinkler Rough-in | 12/14/2011 | 12/14/2011 | 12/14/2011 3:24:02 PM | A | FAIL |
|
|
Noted items include #3, 5 and 7 on the fire code review comments regarding seismic brace attatchments to Z purlins, trapeeze calculations, and supervised tamper control vavles at the new DCVA. Also noted missing lateral branch line restraints per NFPA 13 2010 9.3.6.4 and plan detail. The compressor room appears inadequately heated.
|
FIR11-00571
| INSP-Sprinkler Rough-in/Hydro | 12/13/2011 | 12/14/2011 | 12/14/2011 3:08:20 PM | P | PART |
|
|
Overhead hydrostatic test passed after temp. bypass of the PRV.
|
FIR11-00534
| INSP-Sprinkler Rough-in | 12/14/2011 | 12/14/2011 | 12/14/2011 3:02:40 PM | A | PART |
|
|
|
BLD11-02801
| FIRE-Sprinkler Rough-in | 12/14/2011 | 12/14/2011 | 12/14/2011 3:01:59 PM | A | PART |
|
|
Overhead fire sprinkler work and noted correction items passed rough-in inspection.
|