FIR15-00821
| INSP-Sprinkler Rough-in | 12/14/2015 | 12/14/2015 | 12/14/2015 3:07:48 PM | P | CANC |
|
|
Rescheduled for tomorrow morning
|
BLD15-01216
| FIRE-Final Inspection | 12/14/2015 | 12/14/2015 | 12/14/2015 3:01:42 PM | P | FAIL |
|
|
Provide ADA hardware on the pocket doors, provide single action ADA hardware on the restroom door, repair and test both the exit signs and mount the fire extinguisher.
|
BLD15-02175
| FIRE-Final Inspection | 12/14/2015 | 12/14/2015 | 12/14/2015 2:05:55 PM | P | PASS |
|
|
life safety passed
|
FIR15-00528
| INSP-Final Inspection | 12/14/2015 | 12/14/2015 | 12/14/2015 2:05:26 PM | P | PASS |
|
|
Permit finaled
|
FIR15-00626
| INSP-Sprinkler Rough-in | 12/14/2015 | 12/14/2015 | 12/14/2015 2:04:55 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered
|
FIR15-00719
| INSP-Sprinkler Rough-in/Hydro | 12/14/2015 | 12/14/2015 | 12/14/2015 1:11:28 PM | P | PASS |
|
|
2nd floor hydro test passed
|
BLD15-04314
| FIRE-Final Inspection | 12/8/2015 | 12/14/2015 | 12/14/2015 11:39:48 AM | A | PASS |
|
|
Life safety passed
|
FIR15-00687
| INSP-Sprinkler Rough-in | 12/11/2015 | 12/14/2015 | 12/14/2015 11:22:04 AM | A | PASS |
|
|
RTC - OH 1st floor - Phase 1 See the city approved plans for the branchlines marked "ok" where piping rough-in passed. Need another inspection to verify the 3 1/2" of insulation installed in the joist channels.
|
BLD15-01898
| FIRE-Final Inspection | 12/14/2015 | 12/14/2015 | 12/14/2015 9:37:07 AM | P | FAIL |
|
|
Provide city approved plans, provide revised plans showing the actual wall layout to plan review, mount fire extinguisher as discussed, remove the thumbturn dead bolts from both exit doors, keyed can be installed at the west exit door as discussed. Provide suite number.
|