ELE99-04468
| Final | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | PASS |
|
|
###-#### Rob T/S U/G N ok.
|
ELE99-04260
| Final | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | PASS |
|
|
ron ###-####
|
ELE99-03958
| Final | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 15:35:06. Contact: ###-####. Called.
|
ELE99-04462
| Rough-In Permanent Service | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 15:36:18. Contact: ###-####. R/I P/S U/G N ok.
|
ELE99-03276
| Final | 12/15/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | P | NR |
|
|
rod ###-#### Called wrong brand of breaker GRD. Photo cell GRD bell box bushing for rigid nipple and switch for sign.
|
ELE99-04487
| Rough-In Permanent Service | 12/15/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | P | PASS |
|
|
DAN ###-#### 15 ROOMS A/C 100 AMPS R/I P/S U/G N ok.
|
ELE99-02947
| Final | 12/15/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | P | FAIL |
|
|
LEE ###-#### POOL Called not ready still needs to bond metal when job is completed and panel needs required clearance.
|