Inspections for the day of: Wednesday, December 15, 1999.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM99-03482 Final12/14/199912/15/199912/15/1999 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/14/1999 at 13:01:36. Contact: ###-####. Elevate water heater and pan to prohibit condensate from entering pan.
PLM99-04091 Final12/14/199912/15/199912/15/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/14/1999 at 13:32:29. Contact: ###-####. R/I, final ok.
PLM99-04114 Water and/or Sewer12/14/199912/15/199912/15/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/14/1999 at 14:19:09. Contact: ###-####. Incomplete.
PLM99-04115 Water and/or Sewer12/14/199912/15/199912/15/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/14/1999 at 14:21:21. Contact: ###-####. Incomplete.
PLM99-04116 Water and/or Sewer12/14/199912/15/199912/15/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/14/1999 at 14:22:28. Contact: ###-####. Incomplete.
PLM99-04117 Water and/or Sewer12/14/199912/15/199912/15/1999 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/14/1999 at 14:23:42. Contact: ###-####. Incomplete.
PLM99-04125 Sprinkler (Final)12/15/199912/15/199912/15/1999 12:00:00 AMPPASS
###-####- darin Sprinkler final ok.
PLM99-03166 Final12/15/199912/15/199912/15/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/15/1999 at 09:41:24. Contact: ###-####. Final ok.
PLM99-04130 Plumbing Rough-in12/15/199912/15/199912/15/1999 12:00:00 AMPPART
###-#### GARY Ok to cover inside walls, will change shower valve to thermal or pressure balance.
PLM99-03860 Plumbing Rough-in12/15/199912/15/199912/15/1999 12:00:00 AMPFAIL
Tests failed, use fittings to make offsets in CPUC, hang piping, use approved valves, braze all joints in compressed air systems.