ELE99-03780
| Electrical Rough-In | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | PASS |
|
|
mike ###-#### R/I ok.
|
ELE99-04195
| Final | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | PASS |
|
|
###-#### Final ok.
|
ELE99-03652
| Final | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | FAIL |
|
|
###-#### T/O ok receps not working.
|
ELE99-04474
| Electrical Rough-In | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 16:19:54. Contact: ###-####. Walls ok R/I.
|
ELE99-04375
| Electrical Rough-In | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | PART |
|
|
###-#### partial R/I ok.
|
ELE99-04250
| Final | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/14/1999 at 11:55:17. Contact: ###-####. T/O ok bond water heater disconnect and lights.
|
ELE99-04414
| Final | 12/14/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | P | FAIL |
|
|
###-####-rosealee fn Work done and covered prior to R/I inspection uncover and call for inspection.
|
ELE99-03725
| Final | 12/15/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | P | FAIL |
|
|
LEE ###-#### Could not check without someone on site called Lee and set up conf. For Fri. am.
|
ELE99-03310
| Final | 12/15/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 10:29:08. Contact: ###-####. Switch door open 90 deg. Ampacity.
|
ELE99-04388
| Final | 12/15/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | P | PASS |
|
|
for billboard sign ###-#### george fn P/S U/G ok final.
|
ELE99-04492
| Electrical Rough-In | 12/15/1999 | 12/15/1999 | 12/15/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/15/1999 at 11:30:05. Contact: ###-####. "U" fer ok.
|