PLM08-02749
| Other | 12/15/2008 | 12/15/2008 | 12/15/2008 4:48:02 PM | P | PASS |
|
|
went over the plans with steve
|
PLM08-02479
| Water and/or Sewer | 12/12/2008 | 12/15/2008 | 12/15/2008 4:47:30 PM | A | PART |
|
|
another 120'
|
PLM08-02779
| Plumbing Rough-in | 12/12/2008 | 12/15/2008 | 12/15/2008 4:45:16 PM | P | PART |
|
|
all american plmb Phone #: ###-#### top ri ok not tied in in the crawlspace
|
PLM08-02650
| Plumbing Rough-in | 12/15/2008 | 12/15/2008 | 12/15/2008 2:43:11 PM | P | FAIL |
|
|
brian- re-insp Phone #: ###-#### needs approved plans and all piping to the shower removed
|
PLM08-02760
| Water and/or Sewer | 12/12/2008 | 12/15/2008 | 12/15/2008 8:59:43 AM | A | PART |
|
|
check interceptor test concrete blanket is inplace and covered with snow and ice will reinspect wed pm
|
PLM08-01376
| PLM-Aging Inspection | 12/15/2008 | 12/15/2008 | 12/15/2008 8:55:31 AM | | PASS |
|
|
no calls
|
PLM08-02782
| Sprinkler (Final) | 12/12/2008 | 12/15/2008 | 12/15/2008 8:45:36 AM | A | PASS |
|
|
check for tag
|
PLM08-02781
| Sprinkler (Final) | 12/12/2008 | 12/15/2008 | 12/15/2008 8:45:20 AM | A | PASS |
|
|
check for tag
|