FIR11-00388
| INSP-Final Inspection | 12/14/2011 | 12/15/2011 | 12/16/2011 3:09:32 PM | A | PASS |
|
|
Per state elevator inspector, car installed prior to flashing hat requirement. Permit finaled.
|
FIR11-00613
| INSP-Final Inspection | 12/14/2011 | 12/15/2011 | 12/16/2011 2:57:26 PM | A | PASS |
|
|
Fire sprinkler permit finaled.
|
BLD11-02076
| FIRE-Final Inspection | 12/15/2011 | 12/15/2011 | 12/16/2011 2:55:32 PM | A | PASS |
|
|
|
FIR11-00456
| INSP-Final Inspection | 12/14/2011 | 12/15/2011 | 12/16/2011 2:55:05 PM | A | PASS |
|
|
Verified completed adjustments. Fire sprinkler permit finaled.
|
FIR08-00604
| INSP-Alarm Testing | 12/14/2011 | 12/15/2011 | 12/15/2011 5:13:22 PM | A | PART |
|
|
Completed elevator testing at builidngs 2 and 3, finished dry system riser supervision testing, DH and DD re-checked, panel items and offsite monitoring including account information verified, previous correction items retested. Final pending points map at the panel and record of completion forms.
|
FIR11-00636
| INSP-Sprinkler Rough-in | 12/15/2011 | 12/15/2011 | 12/15/2011 5:08:50 PM | P | PART |
|
|
Overhead rough-in insp. passed. Per contractor wall at the shower enclosure is not full height.
|
FIR11-00583
| INSP-Final Inspection | 12/15/2011 | 12/15/2011 | 12/15/2011 5:06:22 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR11-00396
| INSP-Final Inspection | 12/14/2011 | 12/15/2011 | 12/15/2011 5:04:17 PM | A | PASS |
|
|
Scope of work passed final inspection.
|
FIR11-00542
| INSP-Sprinkler Rough-in | 12/14/2011 | 12/15/2011 | 12/15/2011 5:03:41 PM | A | PART |
|
|
Patient waiting and consultation rooms as marked and dated on approved plans okayed to cover.
|
FIR11-00601
| INSP-Sprinkler Rough-in | 12/14/2011 | 12/15/2011 | 12/15/2011 5:02:35 PM | A | PART |
|
|
Overhead work at the grid ceilings approved for cover. Noted missing ceilings at two areas.
|