Inspections for the day of: Thursday, December 15, 2011.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR11-00388 INSP-Final Inspection12/14/201112/15/201112/16/2011 3:09:32 PMAPASS
Per state elevator inspector, car installed prior to flashing hat requirement. Permit finaled.
FIR11-00613 INSP-Final Inspection12/14/201112/15/201112/16/2011 2:57:26 PMAPASS
Fire sprinkler permit finaled.
BLD11-02076 FIRE-Final Inspection12/15/201112/15/201112/16/2011 2:55:32 PMAPASS
FIR11-00456 INSP-Final Inspection12/14/201112/15/201112/16/2011 2:55:05 PMAPASS
Verified completed adjustments. Fire sprinkler permit finaled.
FIR08-00604 INSP-Alarm Testing12/14/201112/15/201112/15/2011 5:13:22 PMAPART
Completed elevator testing at builidngs 2 and 3, finished dry system riser supervision testing, DH and DD re-checked, panel items and offsite monitoring including account information verified, previous correction items retested. Final pending points map at the panel and record of completion forms.
FIR11-00636 INSP-Sprinkler Rough-in12/15/201112/15/201112/15/2011 5:08:50 PMPPART
Overhead rough-in insp. passed. Per contractor wall at the shower enclosure is not full height.
FIR11-00583 INSP-Final Inspection12/15/201112/15/201112/15/2011 5:06:22 PMPPASS
Fire sprinkler permit finaled.
FIR11-00396 INSP-Final Inspection12/14/201112/15/201112/15/2011 5:04:17 PMAPASS
Scope of work passed final inspection.
FIR11-00542 INSP-Sprinkler Rough-in12/14/201112/15/201112/15/2011 5:03:41 PMAPART
Patient waiting and consultation rooms as marked and dated on approved plans okayed to cover.
FIR11-00601 INSP-Sprinkler Rough-in12/14/201112/15/201112/15/2011 5:02:35 PMAPART
Overhead work at the grid ceilings approved for cover. Noted missing ceilings at two areas.