Inspections for the day of: Thursday, December 15, 2011.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-02353 BLD-Final12/15/201112/15/201112/15/2011 4:16:29 PMPDONE
Walter Phone #: ###-####
BLD11-02353 DOC - Permit Finaled12/15/201112/15/201112/15/2011 4:16:19 PMPPASS
Work already completed. Appeared to be done in accordance with local codes and ordinances.
BLD11-00188 BLD-Final12/15/201112/15/201112/15/2011 4:16:07 PMPDONE
Walter Phone #: ###-####
BLD11-00188 DOC - Permit Finaled12/15/201112/15/201112/15/2011 4:16:00 PMPPASS
Work already completed. Appeared to be done in accordance with local codes and ordinances.
BLD11-02602 BLD-Final12/15/201112/15/201112/15/2011 4:15:48 PMPDONE
Walter Phone #: ###-####
BLD11-02602 DOC - Permit Finaled12/15/201112/15/201112/15/2011 4:15:37 PMPPASS
Work already completed. Appeared to be done in accordance with local codes and ordinances.
BLD11-02355 BLD-Final12/15/201112/15/201112/15/2011 4:15:21 PMPDONE
Walter Phone #: ###-####
BLD11-02355 DOC - Permit Finaled12/15/201112/15/201112/15/2011 4:15:14 PMPPASS
Work already completed. Appeared to be done in accordance with local codes and ordinances.
BLD10-02069 BLD-Conference12/14/201112/15/201112/15/2011 3:20:48 PMPDONE
Gypsum nailing inspection. any time
Concrete wall rebar inspection at chiller building. Special inspector at 1:00 PM. Concrete scheduled at 1:30 PM Phone #: ###-#### >> Inspection requested via web by Scott Greer
BLD10-02069 BLD-Foundation12/15/201112/15/201112/15/2011 3:20:40 PMPPASS
Gypsum nailing inspection. any time
Concrete wall rebar inspection at chiller building. Special inspector at 1:00 PM. Concrete scheduled at 1:30 PM Phone #: ###-#### >> Inspection requested via web by Scott Greer. Vertical and horizontal reinforcement for W1 type walls at grids X12 and and grid Xc per RFI#282.1(These walls are to be architectual concrete. Previously they were to be masonry walls). Noted that vertical reinforcement at these walls was already placed at 12" o.c.
BLD10-02069 BLD-Conference12/1/201112/15/201112/15/2011 3:14:16 PMADONE
BLD10-02069 BLD-Framing/Rough-in12/15/201112/15/201112/15/2011 3:14:05 PMAPASS
Shear wall holdowns at rooms 164 and 175 (mens and womens restroom) per ASI #5. ok to place plywood after electrical rough in inspection passes.
ESC11-00793 Random Inspection12/15/201112/15/201112/15/2011 2:55:35 PMPPASS
BLD11-02644 BLD-Foundation12/14/201112/15/201112/15/2011 2:55:18 PMPPART
Phone #: 8604108 >> Inspection requested via mobile web by ryan
ESC11-00613 BMP Violation12/15/201112/15/201112/15/2011 2:13:15 PMPPASS
BLD11-02039 BLD-Energy code compliance12/14/201112/15/201112/15/2011 2:13:05 PMPPASS
Brett ###-####
BLD11-02039 BLD-Framing/Rough-in12/15/201112/15/201112/15/2011 2:12:56 PMPPASS
Brett ###-####
BLD11-00788 BLD-Final12/15/201112/15/201112/15/2011 1:57:58 PMPNR
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
GCB11-00060 GCB-Final12/14/201112/15/201112/15/2011 11:47:33 AMAFAIL
steve @ ###-####. Provide the required energy certificate and post. Correction notice was issued.
GCB11-00059 GCB-Final12/14/201112/15/201112/15/2011 11:46:44 AMAFAIL
steve @ ###-####. Needs to provide tempered glazing at window next to door in dining room. Correction notice issued.
GCB11-00069 GCB-Footing12/14/201112/15/201112/15/2011 11:06:56 AMAPASS
Jerry @ ###-####11 a.m. inspection. Footing ok. Needs to have architect and engineer re-evaluate existing footing and foundation system.