ELE13-03096
| ELE-Aging Inspection | 12/15/2017 | 12/15/2017 | 12/21/2017 10:55:12 AM | | PASS |
|
|
Sign present with disconnect on left side.
|
ELE17-02033
| Final | 12/15/2017 | 12/15/2017 | 12/15/2017 1:35:32 PM | P | PASS |
|
|
Garage code 0813 Phone #: ###-#### Inspection requested via web by cal crosby Ok final.
|
ELE17-04005
| Permanent Service | 12/15/2017 | 12/15/2017 | 12/15/2017 12:46:17 PM | P | PASS |
|
|
Inspect Meter pedestal for Boise City Street Light. Phone #: ###-#### Inspection requested via web by Chase Sessions p/s u/g n ok. Talked to contractor and mentioned to him that AFC is needed for final.
|
ELE17-01794
| Final | 12/14/2017 | 12/15/2017 | 12/15/2017 12:13:56 PM | A | PASS |
|
|
Homeowners will be home all morning. If you have any questions please call Luke ###-####. Thanks!!! Phone #: ###-#### Inspection requested via web by Clay Morgan Ok final. GFI test on floor heat functions properly.
|
ELE07-02791
| ELE-Aging Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 11:42:56 AM | | DONE |
|
|
Please set up a time with homeowner and schedule a final inspection.
|
ELE13-02985
| Final | 12/15/2017 | 12/15/2017 | 12/15/2017 11:41:26 AM | P | PASS |
|
|
Looked at at 1140 on 12/15/17. Labeling at meters present. Ok final.
|
ELE17-02780
| Electrical Rough-In | 12/15/2017 | 12/15/2017 | 12/15/2017 10:58:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark M Ok cover ceiling throughout.
|
ELE17-02024
| Final | 12/14/2017 | 12/15/2017 | 12/15/2017 9:31:56 AM | A | PASS |
|
|
Shane Phone #: ###-#### Ok final. Switch used for 240v heater came with unit from manufacturer.
|
ELE17-03845
| Electrical Rough-In | 12/14/2017 | 12/15/2017 | 12/15/2017 9:07:42 AM | A | PASS |
|
|
It''s wide open, please call Tony with any questions. Thank You! Phone #: ###-#### Inspection requested via web by Clay Morgan Ok cover. Permanent service not called in. I added a p/s inspection.
|
ELE17-03845
| Permanent Service | 12/15/2017 | 12/15/2017 | 12/15/2017 9:06:55 AM | P | PASS |
|
|
p/s u/g n ok
|
ELE17-03559
| Electrical Rough-In | 12/15/2017 | 12/15/2017 | 12/15/2017 9:06:12 AM | A | NR |
|
|
Please call or text me at ###-#### and I can be there in 15 minutes. Thanks, Jim Hinen Inspection requested via web by James Hinen 1. Wires need to be stapled 1-1/4 away from face of studs. 2. Connectors needed for recess cans. 3. Wires for recess cans need to be secured to studs. 4. Grounds and neutrals need to be made up at all box locations.
|
ELE17-04028
| Electrical Rough-In | 12/13/2017 | 12/15/2017 | 12/15/2017 8:30:32 AM | A | PASS |
|
|
As early as possible would be appreciated. Thanks. Phone #: ###-#### Inspection requested via web by Matt Frey Ok cover 2 baths, closet and utility area. Needs ground screw for dryer outlet and KO seal. Also told Matt he needed to add an outlet between sinks in mstr bath as they are installing one outlet inside medicine cabinet left of vanity. These items can be checked when floor heat is inspected.
|
ELE17-04185
| Final | 12/14/2017 | 12/15/2017 | 12/15/2017 7:38:45 AM | A | PASS |
|
|
Darren ###-#### p/s u/g n ok. Looked at on 12/14/17. Talked to Darren, electrician, conduit running on top of building is being changed to a different layout.
|