BLD97-02848
| INSP - Final | 12/16/1997 | 12/16/1997 | 12/17/1997 12:00:00 AM | P | PASS |
|
|
12/16/97 407 -
|
MEC97-02313
| INSP - Final | 12/17/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | | PASS |
|
|
Note:the A/C condenser unit was not set at time of inspection,because of some grading set backs,left note on the furnace to inspect at final.
|
MEC97-02313
| INSP - Final | 12/17/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | | PASS |
|
|
Note:the A/C condenser unit was not set at time of inspection,because of some grading set backs,left note on the furnace to inspect at final.
|
MEC97-03569
| INSP - Gas log/ Fireplace | 12/16/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | | PASS |
|
|
/ / 407 - gas log.
|
BLD96-02798
| INSP - Framing/Rough-in | 12/17/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | | PART |
|
|
interior steel studs,have correction notice same as gary lane school,as i and carl inspected on 12/15/97.same project manager for both jobs.
|
MEC97-02454
| INSP - Final | 12/15/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | A | FAIL |
|
|
12/16/97 407 - left corrections..
|
MEC97-02454
| INSP - Final | 12/15/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | A | FAIL |
|
|
12/16/97 407 - left corrections..
|
MEC97-02727
| INSP - Final | 12/15/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | A | PASS |
|
|
12/16/97 407 -
|
MEC97-02727
| INSP - Final | 12/15/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | A | PASS |
|
|
12/16/97 407 -
|
BLD97-02905
| INSP - Final | 12/15/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | A | PASS |
|
|
12/16/97 407 - re-insp.
|
BLD97-02323
| INSP - Wall cover | 12/15/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | P | FAIL |
|
|
fire wall
|
MEC97-03737
| INSP - Gas pressure test | 12/16/1997 | 12/16/1997 | 12/16/1997 12:00:00 AM | P | NH |
|
|
12/16/97 407 - left note on front dorr not home.
|