Inspections for the day of: Tuesday, December 16, 2003.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM03-03886 Water and/or Sewer12/15/200312/16/200312/16/2003 12:00:00 AMAPASS
###-#### Steve gary did yesterday 12/16/2003 7:58:43 AM
PLM03-03889 Water and/or Sewer12/15/200312/16/200312/16/2003 12:00:00 AMAPART
GARY; Phone #: ###-#### Internet Inspection Request from: Darla Downs water line and sprinkler valves and riser ok to cover , needs hbvb at bury hydrant to final, called left message. 12/16/2003 8:46:56 AM
PLM03-03871 Plumbing Rough-in12/16/200312/16/200312/16/2003 12:00:00 AMANR
Scheduled by a contractor via Hello! on 12/16/2003 at 7:17:44 AM. Contact: ###-####.
PLM03-03874 Plumbing Rough-in12/16/200312/16/200312/16/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/16/2003 at 7:33:18 AM. Contact: ###-####. ri ok 12/16/2003 2:20:58 PM
PLM03-03871 Plumbing Rough-in12/16/200312/16/200312/16/2003 12:00:00 AMPPASS
ri ok 12/16/2003 1:53:44 PM
PLM03-03646 Final12/16/200312/16/200312/16/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/16/2003 at 9:15:35 AM. Contact: ###-####. rp required at the hood washdownand the chemical system at the mop sink, air gap water softenor backwash drain, and the ice bin drains, set coffee maker, use brass adpt. or dieelectric union at the hood washdown chem injector area. 12/16/2003 4:11:45 PM
PLM03-01400 Final12/16/200312/16/200312/16/2003 12:00:00 AMPPASS
already done-- mary -###-#### looks like a dup. permit to me, they should get a credit it seems to me. 12/16/2003 2:14:24 PM
PLM03-03624 Plumbing Rough-in12/15/200312/16/200312/16/2003 12:00:00 AMPCANC
3pm or so