PLM03-03886
| Water and/or Sewer | 12/15/2003 | 12/16/2003 | 12/16/2003 12:00:00 AM | A | PASS |
|
|
###-#### Steve gary did yesterday 12/16/2003 7:58:43 AM
|
PLM03-03889
| Water and/or Sewer | 12/15/2003 | 12/16/2003 | 12/16/2003 12:00:00 AM | A | PART |
|
|
GARY; Phone #: ###-#### Internet Inspection Request from: Darla Downs water line and sprinkler valves and riser ok to cover , needs hbvb at bury hydrant to final, called left message. 12/16/2003 8:46:56 AM
|
PLM03-03871
| Plumbing Rough-in | 12/16/2003 | 12/16/2003 | 12/16/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/16/2003 at 7:17:44 AM. Contact: ###-####.
|
PLM03-03874
| Plumbing Rough-in | 12/16/2003 | 12/16/2003 | 12/16/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/16/2003 at 7:33:18 AM. Contact: ###-####. ri ok 12/16/2003 2:20:58 PM
|
PLM03-03871
| Plumbing Rough-in | 12/16/2003 | 12/16/2003 | 12/16/2003 12:00:00 AM | P | PASS |
|
|
ri ok 12/16/2003 1:53:44 PM
|
PLM03-03646
| Final | 12/16/2003 | 12/16/2003 | 12/16/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/16/2003 at 9:15:35 AM. Contact: ###-####. rp required at the hood washdownand the chemical system at the mop sink, air gap water softenor backwash drain, and the ice bin drains, set coffee maker, use brass adpt. or dieelectric union at the hood washdown chem injector area. 12/16/2003 4:11:45 PM
|
PLM03-01400
| Final | 12/16/2003 | 12/16/2003 | 12/16/2003 12:00:00 AM | P | PASS |
|
|
already done-- mary -###-#### looks like a dup. permit to me, they should get a credit it seems to me. 12/16/2003 2:14:24 PM
|
PLM03-03624
| Plumbing Rough-in | 12/15/2003 | 12/16/2003 | 12/16/2003 12:00:00 AM | P | CANC |
|
|
3pm or so
|